Skip to content

South East

MEES 2031 exposure in Adur

30 of the 42 industrial and warehouse buildings over 1,000 m² in Adur with an EPC are rated C to E: 737k sq ft (68,487 m²) of floorspace that meets today's E minimum but falls short of the proposed EPC B standard.

Free. No card needed.

Adur in figures

EPC register, snapshot 30 Sep 2026

Rated C to E
737k sq ft68,487 m² in 30 buildings
Rated F or G
1 building35k sq ft (3,276 m²), below today's E minimum
Rated A+ to B
11 buildingsAlready at the proposed standard
Share below B
74%Of 42 buildings over 1,000 m². England and Wales: 70%

Adur has the 274th most floorspace rated C to E of 316 local authorities in England and Wales, and the 46th most of 64 in the South East.

EPC rating mix

Share of buildings over 1,000 m², by latest EPC rating

  • Adur42 buildings
  • South East5,119 buildings
  • England and Wales38,148 buildings
Key: Rated A+–B: At B or better alreadyRated C–E: Meets today's E minimum, short of BRated F–G: Below today's E minimum

Latest certificate per building from the government's EPC register, snapshot 30 Sep 2026. Industrial and warehouse uses (B2 and B8), floor area over 1,000 m² as declared on the EPC; 1 m² is 10.7639 sq ft. How we count it

What stands out in Adur

Compared with the other 63 local authorities in the South East and with England and Wales, from the same EPC register snapshot.

  • Most of its floorspace rated C to E, 90% or 667k sq ft (61,930 m²), is in 29 buildings of 1,000 to 5,000 m².
  • 16 of its 31 buildings rated C to G (52%) have an EPC that has lapsed or is estimated to lapse before 2031, against 54% across England and Wales; 9 have already lapsed.
  • 3 of its 13 C-rated buildings (23%) have an asset rating of 51 to 60, within 10 points of band B: 62k sq ft (5,748 m²) of floorspace. Across England and Wales it's 37%.
  • Storage and distribution (B8) makes up 74% of its buildings over 1,000 m², against 58% across England and Wales.
  • In the 12 months to 30 Sep 2026, 25 industrial and warehouse buildings of any size here had an EPC lodged to be let and 2 for a marketed sale, 27 in all: the 22nd most of 64 local authorities in the South East.
  • The recommendation lodged most often on its certificates rated C to G is “Consider replacing T8 lamps with retrofit T5 conversion kit” (EPC-L5), on 24 of 31 buildings.

Every rating, A+ to G

Adur's 42 industrial and warehouse buildings over 1,000 m² by latest EPC rating, beside the South East and the whole of England and Wales.

By latest EPC rating

Share is of buildings over 1,000 m² in each area.

Adur: industrial and warehouse buildings over 1,000 m² by latest EPC rating, with the share in each band and South East's and England and Wales's
RatingBuildingsFloor areaShareSouth EastEngland and Wales
A+00 sq ft0 m²0%3%2%
A3127k sq ft11,781 m²7%13%10%
B8261k sq ft24,232 m²19%22%19%
C13308k sq ft28,578 m²31%35%36%
D12318k sq ft29,522 m²29%21%22%
E5112k sq ft10,387 m²12%6%9%
F135k sq ft3,276 m²2%1%1%
G00 sq ft0 m²0%1%2%

Within 10 points of B

Rated C with an asset rating of 51 to 60. Band B ends at 50.

3 buildings

Of 13 rated C (23%), with 62k sq ft (5,748 m²) of floorspace. England and Wales: 37% of C-rated buildings.

By building size

Floor area as declared on the EPC.

Adur: industrial and warehouse buildings by floor area
Floor areaBuildingsRated B or betterC to E floor area
Over 1,000 to 5,000 m²3821%8 of 38667k sq ft61,930 m²
Over 5,000 to 10,000 m²475%3 of 471k sq ft6,557 m²
Over 10,000 m²0–0 of 00 sq ft0 m²

Certificates and lettings

An EPC lasts 10 years, and a valid one is needed to let or sell. We estimate expiry as the lodgement date plus 10 years.

When the certificates lapse

Buildings over 1,000 m², by when their latest EPC lapses, at 30 Sep 2026.

Adur: when each building's latest EPC lapses (estimated)
EPC lapsesAll buildingsRated C to GC to G floor area
Already lapsed99273k sq ft25,408 m²
Rest of 2026000 sq ft0 m²
In 20271127k sq ft2,477 m²
In 20283259k sq ft5,482 m²
In 20294355k sq ft5,089 m²
In 20301128k sq ft2,570 m²
2031 or later2415331k sq ft30,737 m²

New EPCs in the last year

Industrial and warehouse buildings of any size whose latest EPC was lodged in the 12 months to 30 Sep 2026, by the reason on the certificate.

To let
25buildings
Marketed sale
2buildings
New build
0buildings
Other reasons
2buildings

29 in all: 86% to let, against 56% across England and Wales. How the daily feed works

Uses, heating and recommendations

What the buildings are used for, how they're heated, and what assessors recommended on the certificates of those rated C to G.

By use

Use from the EPC's property type.

Adur: buildings over 1,000 m² by use, from the EPC's property type
UseBuildingsB or betterC to EF or GC to E floor area
Storage and distribution (B8)318230594k sq ft55,214 m²
General industrial (B2)11371143k sq ft13,273 m²

By main heating fuel

As recorded on each building's latest EPC.

Adur: buildings over 1,000 m² by main heating fuel on the EPC
Main heating fuelBuildingsShareEngland and Wales
Natural gas2457%53%
Grid supplied electricity1638%37%
Oil12%4%
Other12%4%

What assessors recommend

The five most common on the latest certificates of its 31 buildings rated C to G, in the register's wording. A recommendation is the assessor's, not a requirement.

  1. 01

    Consider replacing T8 lamps with retrofit T5 conversion kit.

    EPC-L5. On 24 of 31 buildings (77%)

  2. 02

    Introduce HF (high frequency) ballasts for fluorescent tubes: Reduced number of fittings required.

    EPC-L7. On 21 of 31 buildings (68%)

  3. 03

    In some spaces, the solar gain limit defined in the NCM is exceeded, which might cause overheating. Consider solar control measures such as the application of reflective coating or shading devices to windows.

    EPC-V1. On 21 of 31 buildings (68%)

  4. 04

    Add optimum start/stop to the heating system.

    EPC-H7. On 20 of 31 buildings (65%)

  5. 05

    Some walls have uninsulated cavities - introduce cavity wall insulation.

    EPC-E4. On 18 of 31 buildings (58%)

How Adur compares

Adur has less than 0.1% of the industrial floorspace rated C to E in England and Wales. 74% of its buildings over 1,000 m² are below B, against 63% across the South East and 70% nationally.

Against the region and the country

Adur against the South East and England and Wales: industrial and warehouse buildings over 1,000 m²
AreaOver 1,000 m²Rated C to EC to E floor areaRated F or GShare below B
Adur4230737k sq ft68,487 m²174%
South East5,1193,153101.6m sq ft9,439,390 m²6663%
England and Wales38,14825,6191.01bn sq ft94,020,657 m²1,03770%

Nearby in the South East ranking

Local authorities ranked next to Adur in the South East by floorspace rated C to E
RankLocal authorityC to E floor area
44Sevenoaks912k sq ft84,749 m²
45Lewes880k sq ft81,730 m²
46Adur737k sq ft68,487 m²
47Bracknell Forest725k sq ft67,383 m²
48Reigate and Banstead679k sq ft63,127 m²

What the 2031 proposal means

In June 2026 the government said it intends that privately rented non-domestic buildings over 1,000 m² reach EPC B from 2031, where cost effective. It needs secondary legislation, so for now it's a proposal, not law. What the proposal means

  • C to E: fine today, short of B

    Adur has 30 buildings over 1,000 m² rated C to E. They meet today's E minimum, but would fall short of B if the proposal becomes law while they're let.
  • F or G: below the minimum already

    1 building in Adur is rated F or G. If let, it already needs an improvement or a registered exemption under today's rules.
  • Where cost effective, and only when let

    The 7-year payback test and the exemptions remain. Owner-occupied buildings are counted too, as an EPC can't say whether a building is let. Local weights and measures authorities enforce the rules. MEES in plain English
  • Ratings change at renewal

    16 of Adur's buildings rated C to G have an EPC that has lapsed or is estimated to lapse before 2031. Each needs a new certificate before it's let or sold, and the new rating may differ.

Go building by building

  • One building at a time

    Search by postcode or estate name for each industrial building's rating, floor area, certificate expiry and whether it's over 1,000 m². Free, and you can save five buildings to a free account.

    Check a building in Adur
  • The whole local authority

    Professional's area screens list every industrial building over 1,000 m² in a local authority with its rating and expiry, for 3 local authorities. £79 a month, or £790 a year.

    Compare plans

The Industrial EPC Weekly

Last week's new industrial EPCs by region, every Monday. Free.