76 of the 111 industrial and warehouse buildings over 1,000 m² in Blaby with an EPC are rated C to E: 2.5m sq ft (229,699 m²) of floorspace that meets today's E minimum but falls short of the proposed EPC B standard.

Free. No card needed.

Blaby in figures

EPC register, snapshot 30 Sep 2026

Rated C to E
2.5m sq ft229,699 m² in 76 buildings
Rated F or G
2 buildings42k sq ft (3,944 m²), below today's E minimum
Rated A+ to B
33 buildingsAlready at the proposed standard
Share below B
70%Of 111 buildings over 1,000 m². England and Wales: 70%

Blaby has the 142nd most floorspace rated C to E of 316 local authorities in England and Wales, and the 18th most of 35 in the East Midlands.

EPC rating mix

Share of buildings over 1,000 m², by latest EPC rating

  • Blaby111 buildings
  • East Midlands4,027 buildings
  • England and Wales38,148 buildings
Key: Rated A+–B: At B or better alreadyRated C–E: Meets today's E minimum, short of BRated F–G: Below today's E minimum

Latest certificate per building from the government's EPC register, snapshot 30 Sep 2026. Industrial and warehouse uses (B2 and B8), floor area over 1,000 m² as declared on the EPC; 1 m² is 10.7639 sq ft. How we count it

What stands out in Blaby

Compared with the other 34 local authorities in the East Midlands and with England and Wales, from the same EPC register snapshot.

  • Most of its floorspace rated C to E, 52% or 1.3m sq ft (119,443 m²), is in 62 buildings of 1,000 to 5,000 m².
  • Its largest buildings are likelier to meet B: 80% of the 10 over 10,000 m² are rated B or better, against 21% of those of 1,000 to 5,000 m².
  • 34 of its 78 buildings rated C to G (44%) have an EPC that has lapsed or is estimated to lapse before 2031, against 54% across England and Wales; 16 have already lapsed.
  • 11 of its 41 C-rated buildings (27%) have an asset rating of 51 to 60, within 10 points of band B: 444k sq ft (41,208 m²) of floorspace. Across England and Wales it's 37%.
  • Its storage and distribution buildings are likelier to meet B (39%) than its general industrial ones (18%).
  • Gas is the main heating fuel in 68% of its buildings, against 53% across England and Wales.
  • In the 12 months to 30 Sep 2026, 5 industrial and warehouse buildings of any size here had an EPC lodged to be let and 8 for a marketed sale, 13 in all: the 7th fewest of 35 local authorities in the East Midlands.
  • The recommendation lodged most often on its certificates rated C to G is “Add optimum start/stop to the heating system” (EPC-H7), on 53 of 78 buildings.

Every rating, A+ to G

Blaby's 111 industrial and warehouse buildings over 1,000 m² by latest EPC rating, beside the East Midlands and the whole of England and Wales.

By latest EPC rating

Share is of buildings over 1,000 m² in each area.

Blaby: industrial and warehouse buildings over 1,000 m² by latest EPC rating, with the share in each band and East Midlands's and England and Wales's
RatingBuildingsFloor areaShareEast MidlandsEngland and Wales
A+00 sq ft0 m²0%1%2%
A191.9m sq ft178,122 m²17%10%10%
B14706k sq ft65,632 m²13%18%19%
C411.3m sq ft118,998 m²37%35%36%
D27808k sq ft75,056 m²24%24%22%
E8384k sq ft35,645 m²7%9%9%
F00 sq ft0 m²0%1%1%
G242k sq ft3,944 m²2%2%2%

Within 10 points of B

Rated C with an asset rating of 51 to 60. Band B ends at 50.

11 buildings

Of 41 rated C (27%), with 444k sq ft (41,208 m²) of floorspace. England and Wales: 37% of C-rated buildings.

By building size

Floor area as declared on the EPC.

Blaby: industrial and warehouse buildings by floor area
Floor areaBuildingsRated B or betterC to E floor area
Over 1,000 to 5,000 m²8121%17 of 811.3m sq ft119,443 m²
Over 5,000 to 10,000 m²2040%8 of 20893k sq ft82,967 m²
Over 10,000 m²1080%8 of 10294k sq ft27,289 m²

Certificates and lettings

An EPC lasts 10 years, and a valid one is needed to let or sell. We estimate expiry as the lodgement date plus 10 years.

When the certificates lapse

Buildings over 1,000 m², by when their latest EPC lapses, at 30 Sep 2026.

Blaby: when each building's latest EPC lapses (estimated)
EPC lapsesAll buildingsRated C to GC to G floor area
Already lapsed1916331k sq ft30,753 m²
Rest of 20261113k sq ft1,218 m²
In 20275116k sq ft1,490 m²
In 2028116110k sq ft10,189 m²
In 202986263k sq ft24,476 m²
In 203064126k sq ft11,715 m²
2031 or later61441.7m sq ft153,802 m²

New EPCs in the last year

Industrial and warehouse buildings of any size whose latest EPC was lodged in the 12 months to 30 Sep 2026, by the reason on the certificate.

To let
5buildings
Marketed sale
8buildings
New build
3buildings
Other reasons
3buildings

19 in all: 26% to let, against 56% across England and Wales. How the daily feed works

Uses, heating and recommendations

What the buildings are used for, how they're heated, and what assessors recommended on the certificates of those rated C to G.

By use

Use from the EPC's property type.

Blaby: buildings over 1,000 m² by use, from the EPC's property type
UseBuildingsB or betterC to EF or GC to E floor area
Storage and distribution (B8)62243711.3m sq ft121,519 m²
General industrial (B2)4993911.2m sq ft108,180 m²

By main heating fuel

As recorded on each building's latest EPC.

Blaby: buildings over 1,000 m² by main heating fuel on the EPC
Main heating fuelBuildingsShareEngland and Wales
Natural gas7568%53%
Grid supplied electricity3229%37%
Biomass11%1%
LPG11%1%
Oil11%4%
Other11%4%

What assessors recommend

The five most common on the latest certificates of its 78 buildings rated C to G, in the register's wording. A recommendation is the assessor's, not a requirement.

  1. 01

    Add optimum start/stop to the heating system.

    EPC-H7. On 53 of 78 buildings (68%)

  2. 02

    Consider replacing T8 lamps with retrofit T5 conversion kit.

    EPC-L5. On 52 of 78 buildings (67%)

  3. 03

    Add weather compensation controls to heating system.

    EPC-H8. On 48 of 78 buildings (62%)

  4. 04

    Consider installing building mounted wind turbine(s).

    EPC-R2. On 48 of 78 buildings (62%)

  5. 05

    Carry out a pressure test, identify and treat identified air leakage. Enter result in EPC calculation.

    EPC-E7. On 47 of 78 buildings (60%)

How Blaby compares

Blaby has 0.2% of the industrial floorspace rated C to E in England and Wales. 70% of its buildings over 1,000 m² are below B, against 71% across the East Midlands, and the same as nationally.

Against the region and the country

Blaby against the East Midlands and England and Wales: industrial and warehouse buildings over 1,000 m²
AreaOver 1,000 m²Rated C to EC to E floor areaRated F or GShare below B
Blaby111762.5m sq ft229,699 m²270%
East Midlands4,0272,740130.2m sq ft12,092,961 m²12471%
England and Wales38,14825,6191.01bn sq ft94,020,657 m²1,03770%

Nearby in the East Midlands ranking

Local authorities ranked next to Blaby in the East Midlands by floorspace rated C to E
RankLocal authorityC to E floor area
16South Holland2.7m sq ft254,278 m²
17Newark and Sherwood2.5m sq ft236,512 m²
18Blaby2.5m sq ft229,699 m²
19Boston2.3m sq ft216,735 m²
20Chesterfield2.2m sq ft206,793 m²

What the 2031 proposal means

In June 2026 the government said it intends that privately rented non-domestic buildings over 1,000 m² reach EPC B from 2031, where cost effective. It needs secondary legislation, so for now it's a proposal, not law. What the proposal means

  • C to E: fine today, short of B

    Blaby has 76 buildings over 1,000 m² rated C to E. They meet today's E minimum, but would fall short of B if the proposal becomes law while they're let.
  • F or G: below the minimum already

    2 buildings in Blaby are rated F or G. If let, they already need an improvement or a registered exemption under today's rules.
  • Where cost effective, and only when let

    The 7-year payback test and the exemptions remain. Owner-occupied buildings are counted too, as an EPC can't say whether a building is let. Local weights and measures authorities enforce the rules. MEES in plain English
  • Ratings change at renewal

    34 of Blaby's buildings rated C to G have an EPC that has lapsed or is estimated to lapse before 2031. Each needs a new certificate before it's let or sold, and the new rating may differ.

Go building by building

  • One building at a time

    Search by postcode or estate name for each industrial building's rating, floor area, certificate expiry and whether it's over 1,000 m². Free, and you can save five buildings to a free account.

    Check a building in Blaby
  • The whole local authority

    Professional's area screens list every industrial building over 1,000 m² in a local authority with its rating and expiry, for 3 local authorities. £79 a month, or £790 a year.

    Compare plans

The Industrial EPC Weekly

Last week's new industrial EPCs by region, every Monday. Free.