Skip to content

East Midlands

MEES 2031 exposure in Charnwood

124 of the 165 industrial and warehouse buildings over 1,000 m² in Charnwood with an EPC are rated C to E: 4.5m sq ft (420,830 m²) of floorspace that meets today's E minimum but falls short of the proposed EPC B standard.

Free. No card needed.

Charnwood in figures

EPC register, snapshot 30 Sep 2026

Rated C to E
4.5m sq ft420,830 m² in 124 buildings
Rated F or G
4 buildings261k sq ft (24,266 m²), below today's E minimum
Rated A+ to B
37 buildingsAlready at the proposed standard
Share below B
78%Of 165 buildings over 1,000 m². England and Wales: 70%

Charnwood has the 68th most floorspace rated C to E of 316 local authorities in England and Wales, and the 8th most of 35 in the East Midlands.

EPC rating mix

Share of buildings over 1,000 m², by latest EPC rating

  • Charnwood165 buildings
  • East Midlands4,027 buildings
  • England and Wales38,148 buildings
Key: Rated A+–B: At B or better alreadyRated C–E: Meets today's E minimum, short of BRated F–G: Below today's E minimum

Latest certificate per building from the government's EPC register, snapshot 30 Sep 2026. Industrial and warehouse uses (B2 and B8), floor area over 1,000 m² as declared on the EPC; 1 m² is 10.7639 sq ft. How we count it

What stands out in Charnwood

Compared with the other 34 local authorities in the East Midlands and with England and Wales, from the same EPC register snapshot.

  • Its floorspace rated C to E is spread across sizes: 48% in buildings of 1,000 to 5,000 m², 23% in buildings of 5,000 to 10,000 m², 29% in buildings over 10,000 m².
  • Unusually, its smaller buildings do better: 24% of those of 1,000 to 5,000 m² are rated B or better, against 11% of the 9 over 10,000 m².
  • 57 of its 128 buildings rated C to G (45%) have an EPC that has lapsed or is estimated to lapse before 2031, against 54% across England and Wales; 31 have already lapsed.
  • 21 of its 53 C-rated buildings (40%) have an asset rating of 51 to 60, within 10 points of band B: 1.3m sq ft (117,403 m²) of floorspace. Across England and Wales it's 37%.
  • General industrial (B2) makes up 55% of its buildings over 1,000 m², against 42% across England and Wales.
  • In the 12 months to 30 Sep 2026, 24 industrial and warehouse buildings of any size here had an EPC lodged to be let and 12 for a marketed sale, 36 in all: the 11th most of 35 local authorities in the East Midlands.
  • Two recommendations are joint most common on its certificates rated C to G, each on 81 of 128 buildings: “Add optimum start/stop to the heating system” (EPC-H7) and “Consider replacing T8 lamps with retrofit T5 conversion kit” (EPC-L5).

Every rating, A+ to G

Charnwood's 165 industrial and warehouse buildings over 1,000 m² by latest EPC rating, beside the East Midlands and the whole of England and Wales.

By latest EPC rating

Share is of buildings over 1,000 m² in each area.

Charnwood: industrial and warehouse buildings over 1,000 m² by latest EPC rating, with the share in each band and East Midlands's and England and Wales's
RatingBuildingsFloor areaShareEast MidlandsEngland and Wales
A+00 sq ft0 m²0%1%2%
A592k sq ft8,592 m²3%10%10%
B321.1m sq ft105,201 m²19%18%19%
C532.3m sq ft212,125 m²32%35%36%
D451.4m sq ft129,659 m²27%24%22%
E26851k sq ft79,046 m²16%9%9%
F3250k sq ft23,182 m²2%1%1%
G112k sq ft1,084 m²1%2%2%

Within 10 points of B

Rated C with an asset rating of 51 to 60. Band B ends at 50.

21 buildings

Of 53 rated C (40%), with 1.3m sq ft (117,403 m²) of floorspace. England and Wales: 37% of C-rated buildings.

By building size

Floor area as declared on the EPC.

Charnwood: industrial and warehouse buildings by floor area
Floor areaBuildingsRated B or betterC to E floor area
Over 1,000 to 5,000 m²13524%32 of 1352.2m sq ft202,820 m²
Over 5,000 to 10,000 m²2119%4 of 211.0m sq ft97,493 m²
Over 10,000 m²911%1 of 91.3m sq ft120,517 m²

Certificates and lettings

An EPC lasts 10 years, and a valid one is needed to let or sell. We estimate expiry as the lodgement date plus 10 years.

When the certificates lapse

Buildings over 1,000 m², by when their latest EPC lapses, at 30 Sep 2026.

Charnwood: when each building's latest EPC lapses (estimated)
EPC lapsesAll buildingsRated C to GC to G floor area
Already lapsed32311.3m sq ft121,013 m²
Rest of 2026000 sq ft0 m²
In 202774105k sq ft9,761 m²
In 202865138k sq ft12,865 m²
In 20291512445k sq ft41,347 m²
In 203055236k sq ft21,937 m²
2031 or later100712.6m sq ft238,173 m²

New EPCs in the last year

Industrial and warehouse buildings of any size whose latest EPC was lodged in the 12 months to 30 Sep 2026, by the reason on the certificate.

To let
24buildings
Marketed sale
12buildings
New build
25buildings
Other reasons
0buildings

61 in all: 39% to let, against 56% across England and Wales. How the daily feed works

Uses, heating and recommendations

What the buildings are used for, how they're heated, and what assessors recommended on the certificates of those rated C to G.

By use

Use from the EPC's property type.

Charnwood: buildings over 1,000 m² by use, from the EPC's property type
UseBuildingsB or betterC to EF or GC to E floor area
Storage and distribution (B8)75185611.5m sq ft135,741 m²
General industrial (B2)90196833.1m sq ft285,089 m²

By main heating fuel

As recorded on each building's latest EPC.

Charnwood: buildings over 1,000 m² by main heating fuel on the EPC
Main heating fuelBuildingsShareEngland and Wales
Natural gas8853%53%
Grid supplied electricity5030%37%
Oil138%4%
Other106%4%
Biomass42%1%

What assessors recommend

The five most common on the latest certificates of its 128 buildings rated C to G, in the register's wording. A recommendation is the assessor's, not a requirement.

  1. 01

    Add optimum start/stop to the heating system.

    EPC-H7. On 81 of 128 buildings (63%)

  2. 02

    Consider replacing T8 lamps with retrofit T5 conversion kit.

    EPC-L5. On 81 of 128 buildings (63%)

  3. 03

    Carry out a pressure test, identify and treat identified air leakage. Enter result in EPC calculation.

    EPC-E7. On 80 of 128 buildings (63%)

  4. 04

    Consider installing building mounted wind turbine(s).

    EPC-R2. On 72 of 128 buildings (56%)

  5. 05

    Some windows have high U-values - consider installing secondary glazing.

    EPC-E5. On 67 of 128 buildings (52%)

How Charnwood compares

Charnwood has 0.4% of the industrial floorspace rated C to E in England and Wales. 78% of its buildings over 1,000 m² are below B, against 71% across the East Midlands and 70% nationally.

Against the region and the country

Charnwood against the East Midlands and England and Wales: industrial and warehouse buildings over 1,000 m²
AreaOver 1,000 m²Rated C to EC to E floor areaRated F or GShare below B
Charnwood1651244.5m sq ft420,830 m²478%
East Midlands4,0272,740130.2m sq ft12,092,961 m²12471%
England and Wales38,14825,6191.01bn sq ft94,020,657 m²1,03770%

Nearby in the East Midlands ranking

Local authorities ranked next to Charnwood in the East Midlands by floorspace rated C to E
RankLocal authorityC to E floor area
6North West Leicestershire5.1m sq ft476,187 m²
7Nottingham5.0m sq ft465,363 m²
8Charnwood4.5m sq ft420,830 m²
9Hinckley and Bosworth4.4m sq ft407,167 m²
10Ashfield3.8m sq ft353,165 m²

What the 2031 proposal means

In June 2026 the government said it intends that privately rented non-domestic buildings over 1,000 m² reach EPC B from 2031, where cost effective. It needs secondary legislation, so for now it's a proposal, not law. What the proposal means

  • C to E: fine today, short of B

    Charnwood has 124 buildings over 1,000 m² rated C to E. They meet today's E minimum, but would fall short of B if the proposal becomes law while they're let.
  • F or G: below the minimum already

    4 buildings in Charnwood are rated F or G. If let, they already need an improvement or a registered exemption under today's rules.
  • Where cost effective, and only when let

    The 7-year payback test and the exemptions remain. Owner-occupied buildings are counted too, as an EPC can't say whether a building is let. Local weights and measures authorities enforce the rules. MEES in plain English
  • Ratings change at renewal

    57 of Charnwood's buildings rated C to G have an EPC that has lapsed or is estimated to lapse before 2031. Each needs a new certificate before it's let or sold, and the new rating may differ.

Go building by building

  • One building at a time

    Search by postcode or estate name for each industrial building's rating, floor area, certificate expiry and whether it's over 1,000 m². Free, and you can save five buildings to a free account.

    Check a building in Charnwood
  • The whole local authority

    Professional's area screens list every industrial building over 1,000 m² in a local authority with its rating and expiry, for 3 local authorities. £79 a month, or £790 a year.

    Compare plans

The Industrial EPC Weekly

Last week's new industrial EPCs by region, every Monday. Free.