MEES 2031 exposure in Cherwell

106 of the 205 industrial and warehouse buildings over 1,000 m² in Cherwell with an EPC are rated C to E: 5.0m sq ft (460,736 m²) of floorspace that meets today's E minimum but falls short of the proposed EPC B standard.

Free. No card needed.

Cherwell in figures

EPC register, snapshot 30 Sep 2026

Rated C to E
5.0m sq ft460,736 m² in 106 buildings
Rated F or G
4 buildings63k sq ft (5,825 m²), below today's E minimum
Rated A+ to B
95 buildingsAlready at the proposed standard
Share below B
54%Of 205 buildings over 1,000 m². England and Wales: 70%

Cherwell has the 65th most floorspace rated C to E of 316 local authorities in England and Wales, and the 3rd most of 64 in the South East.

EPC rating mix

Share of buildings over 1,000 m², by latest EPC rating

  • Cherwell205 buildings
  • South East5,119 buildings
  • England and Wales38,148 buildings
Key: Rated A+–B: At B or better alreadyRated C–E: Meets today's E minimum, short of BRated F–G: Below today's E minimum

Latest certificate per building from the government's EPC register, snapshot 30 Sep 2026. Industrial and warehouse uses (B2 and B8), floor area over 1,000 m² as declared on the EPC; 1 m² is 10.7639 sq ft. How we count it

What stands out in Cherwell

Compared with the other 63 local authorities in the South East and with England and Wales, from the same EPC register snapshot.

  • Its floorspace rated C to E is spread across sizes: 36% in buildings of 1,000 to 5,000 m², 22% in buildings of 5,000 to 10,000 m², 42% in buildings over 10,000 m².
  • Its largest buildings are likelier to meet B: 60% of the 30 over 10,000 m² are rated B or better, against 43% of those of 1,000 to 5,000 m².
  • 56 of its 110 buildings rated C to G (51%) have an EPC that has lapsed or is estimated to lapse before 2031, against 54% across England and Wales; 18 have already lapsed.
  • 22 of its 51 C-rated buildings (43%) have an asset rating of 51 to 60, within 10 points of band B: 1.3m sq ft (120,610 m²) of floorspace. Across England and Wales it's 37%.
  • Its storage and distribution buildings are likelier to meet B (56%) than its general industrial ones (30%).
  • More of its buildings are heated mainly by grid electricity (48%) than by gas (43%); across England and Wales gas leads, 53% to 37%.
  • In the 12 months to 30 Sep 2026, 14 industrial and warehouse buildings of any size here had an EPC lodged to be let and 3 for a marketed sale, 17 in all: the 18th fewest of 64 local authorities in the South East.
  • Two recommendations are joint most common on its certificates rated C to G, each on 68 of 110 buildings: “Consider installing solar water heating” (EPC-R3) and “Consider installing PV” (EPC-R4).

Every rating, A+ to G

Cherwell's 205 industrial and warehouse buildings over 1,000 m² by latest EPC rating, beside the South East and the whole of England and Wales.

By latest EPC rating

Share is of buildings over 1,000 m² in each area.

Cherwell: industrial and warehouse buildings over 1,000 m² by latest EPC rating, with the share in each band and South East's and England and Wales's
RatingBuildingsFloor areaShareSouth EastEngland and Wales
A+6303k sq ft28,107 m²3%3%2%
A484.0m sq ft368,901 m²23%13%10%
B412.2m sq ft201,590 m²20%22%19%
C513.1m sq ft289,920 m²25%35%36%
D341.2m sq ft107,722 m²17%21%22%
E21679k sq ft63,094 m²10%6%9%
F345k sq ft4,208 m²1%1%1%
G117k sq ft1,617 m²0%1%2%

Within 10 points of B

Rated C with an asset rating of 51 to 60. Band B ends at 50.

22 buildings

Of 51 rated C (43%), with 1.3m sq ft (120,610 m²) of floorspace. England and Wales: 37% of C-rated buildings.

By building size

Floor area as declared on the EPC.

Cherwell: industrial and warehouse buildings by floor area
Floor areaBuildingsRated B or betterC to E floor area
Over 1,000 to 5,000 m²14843%64 of 1481.8m sq ft164,506 m²
Over 5,000 to 10,000 m²2748%13 of 271.1m sq ft102,457 m²
Over 10,000 m²3060%18 of 302.1m sq ft193,773 m²

Certificates and lettings

An EPC lasts 10 years, and a valid one is needed to let or sell. We estimate expiry as the lodgement date plus 10 years.

When the certificates lapse

Buildings over 1,000 m², by when their latest EPC lapses, at 30 Sep 2026.

Cherwell: when each building's latest EPC lapses (estimated)
EPC lapsesAll buildingsRated C to GC to G floor area
Already lapsed23181.2m sq ft110,617 m²
Rest of 20262246k sq ft4,245 m²
In 202796277k sq ft25,734 m²
In 2028146289k sq ft26,881 m²
In 20291712443k sq ft41,123 m²
In 20301712514k sq ft47,745 m²
2031 or later123542.3m sq ft210,216 m²

New EPCs in the last year

Industrial and warehouse buildings of any size whose latest EPC was lodged in the 12 months to 30 Sep 2026, by the reason on the certificate.

To let
14buildings
Marketed sale
3buildings
New build
12buildings
Other reasons
7buildings

36 in all: 39% to let, against 56% across England and Wales. How the daily feed works

Uses, heating and recommendations

What the buildings are used for, how they're heated, and what assessors recommended on the certificates of those rated C to G.

By use

Use from the EPC's property type.

Cherwell: buildings over 1,000 m² by use, from the EPC's property type
UseBuildingsB or betterC to EF or GC to E floor area
Storage and distribution (B8)131735802.8m sq ft256,676 m²
General industrial (B2)74224842.2m sq ft204,060 m²

By main heating fuel

As recorded on each building's latest EPC.

Cherwell: buildings over 1,000 m² by main heating fuel on the EPC
Main heating fuelBuildingsShareEngland and Wales
Grid supplied electricity9948%37%
Natural gas8943%53%
Oil94%4%
Other63%4%
LPG21%1%

What assessors recommend

The five most common on the latest certificates of its 110 buildings rated C to G, in the register's wording. A recommendation is the assessor's, not a requirement.

  1. 01

    Consider installing solar water heating.

    EPC-R3. On 68 of 110 buildings (62%)

  2. 02

    Consider installing PV.

    EPC-R4. On 68 of 110 buildings (62%)

  3. 03

    Consider replacing T8 lamps with retrofit T5 conversion kit.

    EPC-L5. On 63 of 110 buildings (57%)

  4. 04

    Add optimum start/stop to the heating system.

    EPC-H7. On 57 of 110 buildings (52%)

  5. 05

    Add weather compensation controls to heating system.

    EPC-H8. On 54 of 110 buildings (49%)

How Cherwell compares

Cherwell has 0.5% of the industrial floorspace rated C to E in England and Wales. 54% of its buildings over 1,000 m² are below B, against 63% across the South East and 70% nationally.

Against the region and the country

Cherwell against the South East and England and Wales: industrial and warehouse buildings over 1,000 m²
AreaOver 1,000 m²Rated C to EC to E floor areaRated F or GShare below B
Cherwell2051065.0m sq ft460,736 m²454%
South East5,1193,153101.6m sq ft9,439,390 m²6663%
England and Wales38,14825,6191.01bn sq ft94,020,657 m²1,03770%

Nearby in the South East ranking

Local authorities ranked next to Cherwell in the South East by floorspace rated C to E
RankLocal authorityC to E floor area
1Milton Keynes11.0m sq ft1,025,461 m²
2Buckinghamshire5.2m sq ft485,285 m²
3Cherwell5.0m sq ft460,736 m²
4Test Valley3.7m sq ft343,772 m²
5Vale of White Horse3.3m sq ft311,206 m²

What the 2031 proposal means

In June 2026 the government said it intends that privately rented non-domestic buildings over 1,000 m² reach EPC B from 2031, where cost effective. It needs secondary legislation, so for now it's a proposal, not law. What the proposal means

  • C to E: fine today, short of B

    Cherwell has 106 buildings over 1,000 m² rated C to E. They meet today's E minimum, but would fall short of B if the proposal becomes law while they're let.
  • F or G: below the minimum already

    4 buildings in Cherwell are rated F or G. If let, they already need an improvement or a registered exemption under today's rules.
  • Where cost effective, and only when let

    The 7-year payback test and the exemptions remain. Owner-occupied buildings are counted too, as an EPC can't say whether a building is let. Local weights and measures authorities enforce the rules. MEES in plain English
  • Ratings change at renewal

    56 of Cherwell's buildings rated C to G have an EPC that has lapsed or is estimated to lapse before 2031. Each needs a new certificate before it's let or sold, and the new rating may differ.

Go building by building

  • One building at a time

    Search by postcode or estate name for each industrial building's rating, floor area, certificate expiry and whether it's over 1,000 m². Free, and you can save five buildings to a free account.

    Check a building in Cherwell
  • The whole local authority

    Professional's area screens list every industrial building over 1,000 m² in a local authority with its rating and expiry, for 3 local authorities. £79 a month, or £790 a year.

    Compare plans

The Industrial EPC Weekly

Last week's new industrial EPCs by region, every Monday. Free.