MEES 2031 exposure in Crawley

77 of the 148 industrial and warehouse buildings over 1,000 m² in Crawley with an EPC are rated C to E: 2.9m sq ft (269,955 m²) of floorspace that meets today's E minimum but falls short of the proposed EPC B standard.

Free. No card needed.

Crawley in figures

EPC register, snapshot 30 Sep 2026

Rated C to E
2.9m sq ft269,955 m² in 77 buildings
Rated F or G
1 building20k sq ft (1,904 m²), below today's E minimum
Rated A+ to B
70 buildingsAlready at the proposed standard
Share below B
53%Of 148 buildings over 1,000 m². England and Wales: 70%

Crawley has the 116th most floorspace rated C to E of 316 local authorities in England and Wales, and the 7th most of 64 in the South East.

EPC rating mix

Share of buildings over 1,000 m², by latest EPC rating

  • Crawley148 buildings
  • South East5,119 buildings
  • England and Wales38,148 buildings
Key: Rated A+–B: At B or better alreadyRated C–E: Meets today's E minimum, short of BRated F–G: Below today's E minimum

Latest certificate per building from the government's EPC register, snapshot 30 Sep 2026. Industrial and warehouse uses (B2 and B8), floor area over 1,000 m² as declared on the EPC; 1 m² is 10.7639 sq ft. How we count it

What stands out in Crawley

Compared with the other 63 local authorities in the South East and with England and Wales, from the same EPC register snapshot.

  • Most of its floorspace rated C to E, 50% or 1.5m sq ft (136,233 m²), is in 64 buildings of 1,000 to 5,000 m².
  • 39 of its 78 buildings rated C to G (50%) have an EPC that has lapsed or is estimated to lapse before 2031, against 54% across England and Wales; 15 have already lapsed.
  • 13 of its 42 C-rated buildings (31%) have an asset rating of 51 to 60, within 10 points of band B: 453k sq ft (42,104 m²) of floorspace. Across England and Wales it's 37%.
  • Storage and distribution (B8) makes up 76% of its buildings over 1,000 m², against 58% across England and Wales.
  • More of its buildings are heated mainly by grid electricity (50%) than by gas (48%); across England and Wales gas leads, 53% to 37%.
  • In the 12 months to 30 Sep 2026, 32 industrial and warehouse buildings of any size here had an EPC lodged to be let and 6 for a marketed sale, 38 in all: the 14th most of 64 local authorities in the South East.
  • The recommendation lodged most often on its certificates rated C to G is “Consider installing PV” (EPC-R4), on 44 of 78 buildings.

Every rating, A+ to G

Crawley's 148 industrial and warehouse buildings over 1,000 m² by latest EPC rating, beside the South East and the whole of England and Wales.

By latest EPC rating

Share is of buildings over 1,000 m² in each area.

Crawley: industrial and warehouse buildings over 1,000 m² by latest EPC rating, with the share in each band and South East's and England and Wales's
RatingBuildingsFloor areaShareSouth EastEngland and Wales
A+3222k sq ft20,669 m²2%3%2%
A251.4m sq ft126,634 m²17%13%10%
B421.4m sq ft134,414 m²28%22%19%
C421.4m sq ft130,523 m²28%35%36%
D271.1m sq ft97,568 m²18%21%22%
E8451k sq ft41,864 m²5%6%9%
F120k sq ft1,904 m²1%1%1%
G00 sq ft0 m²0%1%2%

Within 10 points of B

Rated C with an asset rating of 51 to 60. Band B ends at 50.

13 buildings

Of 42 rated C (31%), with 453k sq ft (42,104 m²) of floorspace. England and Wales: 37% of C-rated buildings.

By building size

Floor area as declared on the EPC.

Crawley: industrial and warehouse buildings by floor area
Floor areaBuildingsRated B or betterC to E floor area
Over 1,000 to 5,000 m²11945%54 of 1191.5m sq ft136,233 m²
Over 5,000 to 10,000 m²2055%11 of 20660k sq ft61,289 m²
Over 10,000 m²956%5 of 9780k sq ft72,433 m²

Certificates and lettings

An EPC lasts 10 years, and a valid one is needed to let or sell. We estimate expiry as the lodgement date plus 10 years.

When the certificates lapse

Buildings over 1,000 m², by when their latest EPC lapses, at 30 Sep 2026.

Crawley: when each building's latest EPC lapses (estimated)
EPC lapsesAll buildingsRated C to GC to G floor area
Already lapsed1515431k sq ft40,081 m²
Rest of 2026000 sq ft0 m²
In 202787136k sq ft12,670 m²
In 20287479k sq ft7,330 m²
In 202984213k sq ft19,763 m²
In 203099697k sq ft64,759 m²
2031 or later101391.4m sq ft127,256 m²

New EPCs in the last year

Industrial and warehouse buildings of any size whose latest EPC was lodged in the 12 months to 30 Sep 2026, by the reason on the certificate.

To let
32buildings
Marketed sale
6buildings
New build
2buildings
Other reasons
12buildings

52 in all: 62% to let, against 56% across England and Wales. How the daily feed works

Uses, heating and recommendations

What the buildings are used for, how they're heated, and what assessors recommended on the certificates of those rated C to G.

By use

Use from the EPC's property type.

Crawley: buildings over 1,000 m² by use, from the EPC's property type
UseBuildingsB or betterC to EF or GC to E floor area
Storage and distribution (B8)112615011.6m sq ft152,355 m²
General industrial (B2)3692701.3m sq ft117,600 m²

By main heating fuel

As recorded on each building's latest EPC.

Crawley: buildings over 1,000 m² by main heating fuel on the EPC
Main heating fuelBuildingsShareEngland and Wales
Grid supplied electricity7450%37%
Natural gas7148%53%
Oil21%4%
Other11%4%

What assessors recommend

The five most common on the latest certificates of its 78 buildings rated C to G, in the register's wording. A recommendation is the assessor's, not a requirement.

  1. 01

    Consider installing PV.

    EPC-R4. On 44 of 78 buildings (56%)

  2. 02

    Consider installing solar water heating.

    EPC-R3. On 41 of 78 buildings (53%)

  3. 03

    Consider replacing T8 lamps with retrofit T5 conversion kit.

    EPC-L5. On 38 of 78 buildings (49%)

  4. 04

    Consider installing building mounted wind turbine(s).

    EPC-R2. On 37 of 78 buildings (47%)

  5. 05

    Add optimum start/stop to the heating system.

    EPC-H7. On 34 of 78 buildings (44%)

How Crawley compares

Crawley has 0.3% of the industrial floorspace rated C to E in England and Wales. 53% of its buildings over 1,000 m² are below B, against 63% across the South East and 70% nationally.

Against the region and the country

Crawley against the South East and England and Wales: industrial and warehouse buildings over 1,000 m²
AreaOver 1,000 m²Rated C to EC to E floor areaRated F or GShare below B
Crawley148772.9m sq ft269,955 m²153%
South East5,1193,153101.6m sq ft9,439,390 m²6663%
England and Wales38,14825,6191.01bn sq ft94,020,657 m²1,03770%

Nearby in the South East ranking

Local authorities ranked next to Crawley in the South East by floorspace rated C to E
RankLocal authorityC to E floor area
5Vale of White Horse3.3m sq ft311,206 m²
6West Berkshire3.2m sq ft295,820 m²
7Crawley2.9m sq ft269,955 m²
8Basingstoke and Deane2.9m sq ft269,355 m²
9Eastleigh2.9m sq ft265,512 m²

What the 2031 proposal means

In June 2026 the government said it intends that privately rented non-domestic buildings over 1,000 m² reach EPC B from 2031, where cost effective. It needs secondary legislation, so for now it's a proposal, not law. What the proposal means

  • C to E: fine today, short of B

    Crawley has 77 buildings over 1,000 m² rated C to E. They meet today's E minimum, but would fall short of B if the proposal becomes law while they're let.
  • F or G: below the minimum already

    1 building in Crawley is rated F or G. If let, it already needs an improvement or a registered exemption under today's rules.
  • Where cost effective, and only when let

    The 7-year payback test and the exemptions remain. Owner-occupied buildings are counted too, as an EPC can't say whether a building is let. Local weights and measures authorities enforce the rules. MEES in plain English
  • Ratings change at renewal

    39 of Crawley's buildings rated C to G have an EPC that has lapsed or is estimated to lapse before 2031. Each needs a new certificate before it's let or sold, and the new rating may differ.

Go building by building

  • One building at a time

    Search by postcode or estate name for each industrial building's rating, floor area, certificate expiry and whether it's over 1,000 m². Free, and you can save five buildings to a free account.

    Check a building in Crawley
  • The whole local authority

    Professional's area screens list every industrial building over 1,000 m² in a local authority with its rating and expiry, for 3 local authorities. £79 a month, or £790 a year.

    Compare plans

The Industrial EPC Weekly

Last week's new industrial EPCs by region, every Monday. Free.