Skip to content

East of England

MEES 2031 exposure in Harlow

70 of the 118 industrial and warehouse buildings over 1,000 m² in Harlow with an EPC are rated C to E: 2.5m sq ft (234,937 m²) of floorspace that meets today's E minimum but falls short of the proposed EPC B standard.

Free. No card needed.

Harlow in figures

EPC register, snapshot 30 Sep 2026

Rated C to E
2.5m sq ft234,937 m² in 70 buildings
Rated F or G
2 buildings129k sq ft (11,964 m²), below today's E minimum
Rated A+ to B
46 buildingsAlready at the proposed standard
Share below B
61%Of 118 buildings over 1,000 m². England and Wales: 70%

Harlow has the 139th most floorspace rated C to E of 316 local authorities in England and Wales, and the 14th most of 45 in the East of England.

EPC rating mix

Share of buildings over 1,000 m², by latest EPC rating

  • Harlow118 buildings
  • East of England4,217 buildings
  • England and Wales38,148 buildings
Key: Rated A+–B: At B or better alreadyRated C–E: Meets today's E minimum, short of BRated F–G: Below today's E minimum

Latest certificate per building from the government's EPC register, snapshot 30 Sep 2026. Industrial and warehouse uses (B2 and B8), floor area over 1,000 m² as declared on the EPC; 1 m² is 10.7639 sq ft. How we count it

What stands out in Harlow

Compared with the other 44 local authorities in the East of England and with England and Wales, from the same EPC register snapshot.

  • Most of its floorspace rated C to E, 58% or 1.5m sq ft (137,097 m²), is in 60 buildings of 1,000 to 5,000 m².
  • Its largest buildings are likelier to meet B: 70% of the 10 over 10,000 m² are rated B or better, against 30% of those of 1,000 to 5,000 m².
  • 38 of its 72 buildings rated C to G (53%) have an EPC that has lapsed or is estimated to lapse before 2031, against 54% across England and Wales; 18 have already lapsed.
  • 12 of its 45 C-rated buildings (27%) have an asset rating of 51 to 60, within 10 points of band B: 446k sq ft (41,424 m²) of floorspace. Across England and Wales it's 37%.
  • Its storage and distribution buildings are likelier to meet B (57%) than its general industrial ones (14%).
  • In the 12 months to 30 Sep 2026, 6 industrial and warehouse buildings of any size here had an EPC lodged to be let and 18 for a marketed sale, 24 in all: the 19th most of 45 local authorities in the East of England.
  • The recommendation lodged most often on its certificates rated C to G is “Consider replacing T8 lamps with retrofit T5 conversion kit” (EPC-L5), on 46 of 72 buildings.

Every rating, A+ to G

Harlow's 118 industrial and warehouse buildings over 1,000 m² by latest EPC rating, beside the East of England and the whole of England and Wales.

By latest EPC rating

Share is of buildings over 1,000 m² in each area.

Harlow: industrial and warehouse buildings over 1,000 m² by latest EPC rating, with the share in each band and East of England's and England and Wales's
RatingBuildingsFloor areaShareEast of EnglandEngland and Wales
A+00 sq ft0 m²0%2%2%
A211.3m sq ft116,658 m²18%12%10%
B252.7m sq ft246,619 m²21%20%19%
C451.8m sq ft163,684 m²38%35%36%
D19606k sq ft56,275 m²16%22%22%
E6161k sq ft14,978 m²5%8%9%
F00 sq ft0 m²0%1%1%
G2129k sq ft11,964 m²2%1%2%

Within 10 points of B

Rated C with an asset rating of 51 to 60. Band B ends at 50.

12 buildings

Of 45 rated C (27%), with 446k sq ft (41,424 m²) of floorspace. England and Wales: 37% of C-rated buildings.

By building size

Floor area as declared on the EPC.

Harlow: industrial and warehouse buildings by floor area
Floor areaBuildingsRated B or betterC to E floor area
Over 1,000 to 5,000 m²8730%26 of 871.5m sq ft137,097 m²
Over 5,000 to 10,000 m²2162%13 of 21559k sq ft51,898 m²
Over 10,000 m²1070%7 of 10495k sq ft45,942 m²

Certificates and lettings

An EPC lasts 10 years, and a valid one is needed to let or sell. We estimate expiry as the lodgement date plus 10 years.

When the certificates lapse

Buildings over 1,000 m², by when their latest EPC lapses, at 30 Sep 2026.

Harlow: when each building's latest EPC lapses (estimated)
EPC lapsesAll buildingsRated C to GC to G floor area
Already lapsed23181.0m sq ft95,763 m²
Rest of 20263357k sq ft5,327 m²
In 20274387k sq ft8,106 m²
In 20282245k sq ft4,219 m²
In 202998349k sq ft32,386 m²
In 203064118k sq ft10,949 m²
2031 or later7134970k sq ft90,151 m²

New EPCs in the last year

Industrial and warehouse buildings of any size whose latest EPC was lodged in the 12 months to 30 Sep 2026, by the reason on the certificate.

To let
6buildings
Marketed sale
18buildings
New build
0buildings
Other reasons
11buildings

35 in all: 17% to let, against 56% across England and Wales. How the daily feed works

Uses, heating and recommendations

What the buildings are used for, how they're heated, and what assessors recommended on the certificates of those rated C to G.

By use

Use from the EPC's property type.

Harlow: buildings over 1,000 m² by use, from the EPC's property type
UseBuildingsB or betterC to EF or GC to E floor area
Storage and distribution (B8)69392911.4m sq ft128,086 m²
General industrial (B2)4974111.2m sq ft106,851 m²

By main heating fuel

As recorded on each building's latest EPC.

Harlow: buildings over 1,000 m² by main heating fuel on the EPC
Main heating fuelBuildingsShareEngland and Wales
Natural gas7160%53%
Grid supplied electricity4336%37%
Biomass22%1%
Oil11%4%
Other11%4%

What assessors recommend

The five most common on the latest certificates of its 72 buildings rated C to G, in the register's wording. A recommendation is the assessor's, not a requirement.

  1. 01

    Consider replacing T8 lamps with retrofit T5 conversion kit.

    EPC-L5. On 46 of 72 buildings (64%)

  2. 02

    Consider installing PV.

    EPC-R4. On 43 of 72 buildings (60%)

  3. 03

    Consider installing solar water heating.

    EPC-R3. On 36 of 72 buildings (50%)

  4. 04

    Introduce HF (high frequency) ballasts for fluorescent tubes: Reduced number of fittings required.

    EPC-L7. On 34 of 72 buildings (47%)

  5. 05

    Carry out a pressure test, identify and treat identified air leakage. Enter result in EPC calculation.

    EPC-E7. On 32 of 72 buildings (44%)

How Harlow compares

Harlow has 0.2% of the industrial floorspace rated C to E in England and Wales. 61% of its buildings over 1,000 m² are below B, against 67% across the East of England and 70% nationally.

Against the region and the country

Harlow against the East of England and England and Wales: industrial and warehouse buildings over 1,000 m²
AreaOver 1,000 m²Rated C to EC to E floor areaRated F or GShare below B
Harlow118702.5m sq ft234,937 m²261%
East of England4,2172,69393.1m sq ft8,647,375 m²12067%
England and Wales38,14825,6191.01bn sq ft94,020,657 m²1,03770%

Nearby in the East of England ranking

Local authorities ranked next to Harlow in the East of England by floorspace rated C to E
RankLocal authorityC to E floor area
12Luton2.6m sq ft239,771 m²
13East Suffolk2.6m sq ft239,285 m²
14Harlow2.5m sq ft234,937 m²
15South Cambridgeshire2.4m sq ft221,830 m²
16Ipswich2.3m sq ft213,917 m²

What the 2031 proposal means

In June 2026 the government said it intends that privately rented non-domestic buildings over 1,000 m² reach EPC B from 2031, where cost effective. It needs secondary legislation, so for now it's a proposal, not law. What the proposal means

  • C to E: fine today, short of B

    Harlow has 70 buildings over 1,000 m² rated C to E. They meet today's E minimum, but would fall short of B if the proposal becomes law while they're let.
  • F or G: below the minimum already

    2 buildings in Harlow are rated F or G. If let, they already need an improvement or a registered exemption under today's rules.
  • Where cost effective, and only when let

    The 7-year payback test and the exemptions remain. Owner-occupied buildings are counted too, as an EPC can't say whether a building is let. Local weights and measures authorities enforce the rules. MEES in plain English
  • Ratings change at renewal

    38 of Harlow's buildings rated C to G have an EPC that has lapsed or is estimated to lapse before 2031. Each needs a new certificate before it's let or sold, and the new rating may differ.

Go building by building

  • One building at a time

    Search by postcode or estate name for each industrial building's rating, floor area, certificate expiry and whether it's over 1,000 m². Free, and you can save five buildings to a free account.

    Check a building in Harlow
  • The whole local authority

    Professional's area screens list every industrial building over 1,000 m² in a local authority with its rating and expiry, for 3 local authorities. £79 a month, or £790 a year.

    Compare plans

The Industrial EPC Weekly

Last week's new industrial EPCs by region, every Monday. Free.