South East
MEES 2031 exposure in Hastings
18 of the 26 industrial and warehouse buildings over 1,000 m² in Hastings with an EPC are rated C to E: 371k sq ft (34,499 m²) of floorspace that meets today's E minimum but falls short of the proposed EPC B standard.
Free. No card needed.
Hastings in figures
EPC register, snapshot 30 Sep 2026
- Rated C to E
- 371k sq ft34,499 m² in 18 buildings
- Rated F or G
- 0 buildingsNone below today's E minimum
- Rated A+ to B
- 8 buildingsAlready at the proposed standard
- Share below B
- 69%Of 26 buildings over 1,000 m². England and Wales: 70%
Hastings has the 303rd most floorspace rated C to E of 316 local authorities in England and Wales, and the 58th most of 64 in the South East.
EPC rating mix
Share of buildings over 1,000 m², by latest EPC rating
- Hastings26 buildings31%69%
- South East5,119 buildings37%62%
- England and Wales38,148 buildings30%67%
Latest certificate per building from the government's EPC register, snapshot 30 Sep 2026. Industrial and warehouse uses (B2 and B8), floor area over 1,000 m² as declared on the EPC; 1 m² is 10.7639 sq ft. How we count it
What stands out in Hastings
Compared with the other 63 local authorities in the South East and with England and Wales, from the same EPC register snapshot.
- None of its buildings over 1,000 m² is rated F or G, as in 30 of the other 63 local authorities in the South East.
- Most of its floorspace rated C to E, 79% or 293k sq ft (27,266 m²), is in 17 buildings of 1,000 to 5,000 m².
- 7 of its 18 buildings rated C to G (39%) have an EPC that has lapsed or is estimated to lapse before 2031, against 54% across England and Wales; 1 has already lapsed.
- 4 of its 10 C-rated buildings (40%) have an asset rating of 51 to 60, within 10 points of band B: 54k sq ft (4,974 m²) of floorspace. Across England and Wales it's 37%.
- In the 12 months to 30 Sep 2026, 3 industrial and warehouse buildings of any size here had an EPC lodged to be let and 10 for a marketed sale, 13 in all: the 13th fewest of 64 local authorities in the South East.
- Two recommendations are joint most common on its certificates rated C to G, each on 11 of 18 buildings: “Consider installing solar water heating” (EPC-R3) and “Consider installing PV” (EPC-R4).
Every rating, A+ to G
Hastings's 26 industrial and warehouse buildings over 1,000 m² by latest EPC rating, beside the South East and the whole of England and Wales.
By latest EPC rating
Share is of buildings over 1,000 m² in each area.
| Rating | Buildings | Floor area | Share | South East | England and Wales |
|---|---|---|---|---|---|
| A+ | 0 | 0 sq ft0 m² | 0% | 3% | 2% |
| A | 1 | 15k sq ft1,389 m² | 4% | 13% | 10% |
| B | 7 | 303k sq ft28,179 m² | 27% | 22% | 19% |
| C | 10 | 168k sq ft15,641 m² | 38% | 35% | 36% |
| D | 6 | 112k sq ft10,425 m² | 23% | 21% | 22% |
| E | 2 | 91k sq ft8,433 m² | 8% | 6% | 9% |
| F | 0 | 0 sq ft0 m² | 0% | 1% | 1% |
| G | 0 | 0 sq ft0 m² | 0% | 1% | 2% |
Within 10 points of B
Rated C with an asset rating of 51 to 60. Band B ends at 50.
4 buildings
Of 10 rated C (40%), with 54k sq ft (4,974 m²) of floorspace. England and Wales: 37% of C-rated buildings.
By building size
Floor area as declared on the EPC.
| Floor area | Buildings | Rated B or better | C to E floor area |
|---|---|---|---|
| Over 1,000 to 5,000 m² | 23 | 26%6 of 23 | 293k sq ft27,266 m² |
| Over 5,000 to 10,000 m² | 3 | 67%2 of 3 | 78k sq ft7,233 m² |
| Over 10,000 m² | 0 | –0 of 0 | 0 sq ft0 m² |
Certificates and lettings
An EPC lasts 10 years, and a valid one is needed to let or sell. We estimate expiry as the lodgement date plus 10 years.
When the certificates lapse
Buildings over 1,000 m², by when their latest EPC lapses, at 30 Sep 2026.
| EPC lapses | All buildings | Rated C to G | C to G floor area |
|---|---|---|---|
| Already lapsed | 1 | 1 | 78k sq ft7,233 m² |
| Rest of 2026 | 0 | 0 | 0 sq ft0 m² |
| In 2027 | 2 | 2 | 25k sq ft2,350 m² |
| In 2028 | 0 | 0 | 0 sq ft0 m² |
| In 2029 | 2 | 2 | 26k sq ft2,382 m² |
| In 2030 | 3 | 2 | 29k sq ft2,694 m² |
| 2031 or later | 18 | 11 | 214k sq ft19,840 m² |
New EPCs in the last year
Industrial and warehouse buildings of any size whose latest EPC was lodged in the 12 months to 30 Sep 2026, by the reason on the certificate.
- To let
- 3buildings
- Marketed sale
- 10buildings
- New build
- 0buildings
- Other reasons
- 0buildings
13 in all: 23% to let, against 56% across England and Wales. How the daily feed works
Uses, heating and recommendations
What the buildings are used for, how they're heated, and what assessors recommended on the certificates of those rated C to G.
By use
Use from the EPC's property type.
| Use | Buildings | B or better | C to E | F or G | C to E floor area |
|---|---|---|---|---|---|
| Storage and distribution (B8) | 15 | 4 | 11 | 0 | 199k sq ft18,451 m² |
| General industrial (B2) | 11 | 4 | 7 | 0 | 173k sq ft16,048 m² |
By main heating fuel
As recorded on each building's latest EPC.
| Main heating fuel | Buildings | Share | England and Wales |
|---|---|---|---|
| Natural gas | 15 | 58% | 53% |
| Grid supplied electricity | 11 | 42% | 37% |
What assessors recommend
The five most common on the latest certificates of its 18 buildings rated C to G, in the register's wording. A recommendation is the assessor's, not a requirement.
- 01
Consider installing solar water heating.
EPC-R3. On 11 of 18 buildings (61%)
- 02
Consider installing PV.
EPC-R4. On 11 of 18 buildings (61%)
- 03
In some spaces, the solar gain limit defined in the NCM is exceeded, which might cause overheating. Consider solar control measures such as the application of reflective coating or shading devices to windows.
EPC-V1. On 9 of 18 buildings (50%)
- 04
Some windows have high U-values - consider installing secondary glazing.
EPC-E5. On 8 of 18 buildings (44%)
- 05
Add optimum start/stop to the heating system.
EPC-H7. On 8 of 18 buildings (44%)
How Hastings compares
Hastings has less than 0.1% of the industrial floorspace rated C to E in England and Wales. 69% of its buildings over 1,000 m² are below B, against 63% across the South East and 70% nationally.
Against the region and the country
| Area | Over 1,000 m² | Rated C to E | C to E floor area | Rated F or G | Share below B |
|---|---|---|---|---|---|
| Hastings | 26 | 18 | 371k sq ft34,499 m² | 0 | 69% |
| South East | 5,119 | 3,153 | 101.6m sq ft9,439,390 m² | 66 | 63% |
| England and Wales | 38,148 | 25,619 | 1.01bn sq ft94,020,657 m² | 1,037 | 70% |
Nearby in the South East ranking
| Rank | Local authority | C to E floor area |
|---|---|---|
| 56 | Eastbourne | 502k sq ft46,612 m² |
| 57 | Gravesham | 469k sq ft43,552 m² |
| 58 | Hastings | 371k sq ft34,499 m² |
| 59 | Waverley | 356k sq ft33,038 m² |
| 60 | Hart | 341k sq ft31,650 m² |
What the 2031 proposal means
In June 2026 the government said it intends that privately rented non-domestic buildings over 1,000 m² reach EPC B from 2031, where cost effective. It needs secondary legislation, so for now it's a proposal, not law. What the proposal means
C to E: fine today, short of B
Hastings has 18 buildings over 1,000 m² rated C to E. They meet today's E minimum, but would fall short of B if the proposal becomes law while they're let.F or G: below the minimum already
No building over 1,000 m² in Hastings has a latest EPC rated F or G.Where cost effective, and only when let
The 7-year payback test and the exemptions remain. Owner-occupied buildings are counted too, as an EPC can't say whether a building is let. Local weights and measures authorities enforce the rules. MEES in plain EnglishRatings change at renewal
7 of Hastings's buildings rated C to G have an EPC that has lapsed or is estimated to lapse before 2031. Each needs a new certificate before it's let or sold, and the new rating may differ.
Go building by building
One building at a time
Search by postcode or estate name for each industrial building's rating, floor area, certificate expiry and whether it's over 1,000 m². Free, and you can save five buildings to a free account.
Check a building in HastingsThe whole local authority
Professional's area screens list every industrial building over 1,000 m² in a local authority with its rating and expiry, for 3 local authorities. £79 a month, or £790 a year.
Compare plans