Skip to content

North West

MEES 2031 exposure in Pendle

66 of the 79 industrial and warehouse buildings over 1,000 m² in Pendle with an EPC are rated C to E: 2.9m sq ft (266,675 m²) of floorspace that meets today's E minimum but falls short of the proposed EPC B standard.

Free. No card needed.

Pendle in figures

EPC register, snapshot 30 Sep 2026

Rated C to E
2.9m sq ft266,675 m² in 66 buildings
Rated F or G
4 buildings250k sq ft (23,265 m²), below today's E minimum
Rated A+ to B
9 buildingsAlready at the proposed standard
Share below B
89%Of 79 buildings over 1,000 m². England and Wales: 70%

Pendle has the 118th most floorspace rated C to E of 316 local authorities in England and Wales, and the 23rd most of 35 in the North West.

EPC rating mix

Share of buildings over 1,000 m², by latest EPC rating

  • Pendle79 buildings
  • North West5,313 buildings
  • England and Wales38,148 buildings
Key: Rated A+–B: At B or better alreadyRated C–E: Meets today's E minimum, short of BRated F–G: Below today's E minimum

Latest certificate per building from the government's EPC register, snapshot 30 Sep 2026. Industrial and warehouse uses (B2 and B8), floor area over 1,000 m² as declared on the EPC; 1 m² is 10.7639 sq ft. How we count it

What stands out in Pendle

Compared with the other 34 local authorities in the North West and with England and Wales, from the same EPC register snapshot.

  • Its share of buildings rated F or G (5%) is the 3rd highest of 35 local authorities in the North West.
  • Its floorspace rated C to E is spread across sizes: 40% in buildings of 1,000 to 5,000 m², 28% in buildings of 5,000 to 10,000 m², 31% in buildings over 10,000 m².
  • Unusually, its smaller buildings do better: 13% of those of 1,000 to 5,000 m² are rated B or better, against 0% of the 6 over 10,000 m².
  • 38 of its 70 buildings rated C to G (54%) have an EPC that has lapsed or is estimated to lapse before 2031, against 54% across England and Wales; 15 have already lapsed.
  • 11 of its 26 C-rated buildings (42%) have an asset rating of 51 to 60, within 10 points of band B: 450k sq ft (41,849 m²) of floorspace. Across England and Wales it's 37%.
  • General industrial (B2) makes up 75% of its buildings over 1,000 m², against 42% across England and Wales.
  • Gas is the main heating fuel in 80% of its buildings, against 53% across England and Wales.
  • In the 12 months to 30 Sep 2026, 10 industrial and warehouse buildings of any size here had an EPC lodged to be let and 7 for a marketed sale, 17 in all: the 7th fewest of 35 local authorities in the North West.
  • The recommendation lodged most often on its certificates rated C to G is “Consider replacing T8 lamps with retrofit T5 conversion kit” (EPC-L5), on 60 of 70 buildings.

Every rating, A+ to G

Pendle's 79 industrial and warehouse buildings over 1,000 m² by latest EPC rating, beside the North West and the whole of England and Wales.

By latest EPC rating

Share is of buildings over 1,000 m² in each area.

Pendle: industrial and warehouse buildings over 1,000 m² by latest EPC rating, with the share in each band and North West's and England and Wales's
RatingBuildingsFloor areaShareNorth WestEngland and Wales
A+00 sq ft0 m²0%1%2%
A297k sq ft9,010 m²3%9%10%
B7242k sq ft22,481 m²9%18%19%
C261.0m sq ft97,340 m²33%37%36%
D281.5m sq ft139,107 m²35%22%22%
E12325k sq ft30,228 m²15%10%9%
F255k sq ft5,088 m²3%1%1%
G2196k sq ft18,177 m²3%2%2%

Within 10 points of B

Rated C with an asset rating of 51 to 60. Band B ends at 50.

11 buildings

Of 26 rated C (42%), with 450k sq ft (41,849 m²) of floorspace. England and Wales: 37% of C-rated buildings.

By building size

Floor area as declared on the EPC.

Pendle: industrial and warehouse buildings by floor area
Floor areaBuildingsRated B or betterC to E floor area
Over 1,000 to 5,000 m²6013%8 of 601.2m sq ft107,733 m²
Over 5,000 to 10,000 m²138%1 of 13813k sq ft75,521 m²
Over 10,000 m²60%0 of 6898k sq ft83,421 m²

Certificates and lettings

An EPC lasts 10 years, and a valid one is needed to let or sell. We estimate expiry as the lodgement date plus 10 years.

When the certificates lapse

Buildings over 1,000 m², by when their latest EPC lapses, at 30 Sep 2026.

Pendle: when each building's latest EPC lapses (estimated)
EPC lapsesAll buildingsRated C to GC to G floor area
Already lapsed1615774k sq ft71,908 m²
Rest of 20261126k sq ft2,388 m²
In 202766112k sq ft10,375 m²
In 202898434k sq ft40,322 m²
In 20292113k sq ft1,164 m²
In 203077283k sq ft26,303 m²
2031 or later38321.5m sq ft137,480 m²

New EPCs in the last year

Industrial and warehouse buildings of any size whose latest EPC was lodged in the 12 months to 30 Sep 2026, by the reason on the certificate.

To let
10buildings
Marketed sale
7buildings
New build
0buildings
Other reasons
1building

18 in all: 56% to let, against 56% across England and Wales. How the daily feed works

Uses, heating and recommendations

What the buildings are used for, how they're heated, and what assessors recommended on the certificates of those rated C to G.

By use

Use from the EPC's property type.

Pendle: buildings over 1,000 m² by use, from the EPC's property type
UseBuildingsB or betterC to EF or GC to E floor area
Storage and distribution (B8)202171720k sq ft66,934 m²
General industrial (B2)5974932.1m sq ft199,741 m²

By main heating fuel

As recorded on each building's latest EPC.

Pendle: buildings over 1,000 m² by main heating fuel on the EPC
Main heating fuelBuildingsShareEngland and Wales
Natural gas6380%53%
Grid supplied electricity1114%37%
Other45%4%
Oil11%4%

What assessors recommend

The five most common on the latest certificates of its 70 buildings rated C to G, in the register's wording. A recommendation is the assessor's, not a requirement.

  1. 01

    Consider replacing T8 lamps with retrofit T5 conversion kit.

    EPC-L5. On 60 of 70 buildings (86%)

  2. 02

    Introduce HF (high frequency) ballasts for fluorescent tubes: Reduced number of fittings required.

    EPC-L7. On 50 of 70 buildings (71%)

  3. 03

    Some windows have high U-values - consider installing secondary glazing.

    EPC-E5. On 43 of 70 buildings (61%)

  4. 04

    Add optimum start/stop to the heating system.

    EPC-H7. On 43 of 70 buildings (61%)

  5. 05

    Carry out a pressure test, identify and treat identified air leakage. Enter result in EPC calculation.

    EPC-E7. On 42 of 70 buildings (60%)

How Pendle compares

Pendle has 0.3% of the industrial floorspace rated C to E in England and Wales. 89% of its buildings over 1,000 m² are below B, against 72% across the North West and 70% nationally.

Against the region and the country

Pendle against the North West and England and Wales: industrial and warehouse buildings over 1,000 m²
AreaOver 1,000 m²Rated C to EC to E floor areaRated F or GShare below B
Pendle79662.9m sq ft266,675 m²489%
North West5,3133,674160.1m sq ft14,878,125 m²16372%
England and Wales38,14825,6191.01bn sq ft94,020,657 m²1,03770%

Nearby in the North West ranking

Local authorities ranked next to Pendle in the North West by floorspace rated C to E
RankLocal authorityC to E floor area
21Stockport3.7m sq ft347,973 m²
22Hyndburn3.4m sq ft311,904 m²
23Pendle2.9m sq ft266,675 m²
24Westmorland and Furness2.9m sq ft265,847 m²
25Bury2.7m sq ft247,574 m²

What the 2031 proposal means

In June 2026 the government said it intends that privately rented non-domestic buildings over 1,000 m² reach EPC B from 2031, where cost effective. It needs secondary legislation, so for now it's a proposal, not law. What the proposal means

  • C to E: fine today, short of B

    Pendle has 66 buildings over 1,000 m² rated C to E. They meet today's E minimum, but would fall short of B if the proposal becomes law while they're let.
  • F or G: below the minimum already

    4 buildings in Pendle are rated F or G. If let, they already need an improvement or a registered exemption under today's rules.
  • Where cost effective, and only when let

    The 7-year payback test and the exemptions remain. Owner-occupied buildings are counted too, as an EPC can't say whether a building is let. Local weights and measures authorities enforce the rules. MEES in plain English
  • Ratings change at renewal

    38 of Pendle's buildings rated C to G have an EPC that has lapsed or is estimated to lapse before 2031. Each needs a new certificate before it's let or sold, and the new rating may differ.

Go building by building

  • One building at a time

    Search by postcode or estate name for each industrial building's rating, floor area, certificate expiry and whether it's over 1,000 m². Free, and you can save five buildings to a free account.

    Check a building in Pendle
  • The whole local authority

    Professional's area screens list every industrial building over 1,000 m² in a local authority with its rating and expiry, for 3 local authorities. £79 a month, or £790 a year.

    Compare plans

The Industrial EPC Weekly

Last week's new industrial EPCs by region, every Monday. Free.