Skip to content

North East

MEES 2031 exposure in Redcar and Cleveland

31 of the 47 industrial and warehouse buildings over 1,000 m² in Redcar and Cleveland with an EPC are rated C to E: 1.3m sq ft (118,797 m²) of floorspace that meets today's E minimum but falls short of the proposed EPC B standard.

Free. No card needed.

Redcar and Cleveland in figures

EPC register, snapshot 30 Sep 2026

Rated C to E
1.3m sq ft118,797 m² in 31 buildings
Rated F or G
3 buildings178k sq ft (16,529 m²), below today's E minimum
Rated A+ to B
13 buildingsAlready at the proposed standard
Share below B
72%Of 47 buildings over 1,000 m². England and Wales: 70%

Redcar and Cleveland has the 222nd most floorspace rated C to E of 316 local authorities in England and Wales, and the 11th most of 12 in the North East.

EPC rating mix

Share of buildings over 1,000 m², by latest EPC rating

  • Redcar and Cleveland47 buildings
  • North East1,710 buildings
  • England and Wales38,148 buildings
Key: Rated A+–B: At B or better alreadyRated C–E: Meets today's E minimum, short of BRated F–G: Below today's E minimum

Latest certificate per building from the government's EPC register, snapshot 30 Sep 2026. Industrial and warehouse uses (B2 and B8), floor area over 1,000 m² as declared on the EPC; 1 m² is 10.7639 sq ft. How we count it

What stands out in Redcar and Cleveland

Compared with the other 11 local authorities in the North East and with England and Wales, from the same EPC register snapshot.

  • Its share of buildings rated F or G (6%) is the 2nd highest of 12 local authorities in the North East.
  • Its floorspace rated C to E is spread across sizes: 50% in buildings of 1,000 to 5,000 m², 18% in buildings of 5,000 to 10,000 m², 33% in buildings over 10,000 m².
  • 19 of its 34 buildings rated C to G (56%) have an EPC that has lapsed or is estimated to lapse before 2031, against 54% across England and Wales; 8 have already lapsed.
  • 6 of its 17 C-rated buildings (35%) have an asset rating of 51 to 60, within 10 points of band B: 149k sq ft (13,836 m²) of floorspace. Across England and Wales it's 37%.
  • General industrial (B2) makes up 81% of its buildings over 1,000 m², against 42% across England and Wales.
  • In the 12 months to 30 Sep 2026, 9 industrial and warehouse buildings of any size here had an EPC lodged to be let and 2 for a marketed sale, 11 in all: the 2nd fewest of 12 local authorities in the North East.
  • The recommendation lodged most often on its certificates rated C to G is “Consider replacing T8 lamps with retrofit T5 conversion kit” (EPC-L5), on 28 of 34 buildings.

Every rating, A+ to G

Redcar and Cleveland's 47 industrial and warehouse buildings over 1,000 m² by latest EPC rating, beside the North East and the whole of England and Wales.

By latest EPC rating

Share is of buildings over 1,000 m² in each area.

Redcar and Cleveland: industrial and warehouse buildings over 1,000 m² by latest EPC rating, with the share in each band and North East's and England and Wales's
RatingBuildingsFloor areaShareNorth EastEngland and Wales
A+00 sq ft0 m²0%1%2%
A3159k sq ft14,783 m²6%6%10%
B10211k sq ft19,631 m²21%19%19%
C17833k sq ft77,391 m²36%39%36%
D11356k sq ft33,040 m²23%23%22%
E390k sq ft8,366 m²6%9%9%
F00 sq ft0 m²0%2%1%
G3178k sq ft16,529 m²6%2%2%

Within 10 points of B

Rated C with an asset rating of 51 to 60. Band B ends at 50.

6 buildings

Of 17 rated C (35%), with 149k sq ft (13,836 m²) of floorspace. England and Wales: 37% of C-rated buildings.

By building size

Floor area as declared on the EPC.

Redcar and Cleveland: industrial and warehouse buildings by floor area
Floor areaBuildingsRated B or betterC to E floor area
Over 1,000 to 5,000 m²3829%11 of 38634k sq ft58,913 m²
Over 5,000 to 10,000 m²729%2 of 7227k sq ft21,053 m²
Over 10,000 m²20%0 of 2418k sq ft38,831 m²

Certificates and lettings

An EPC lasts 10 years, and a valid one is needed to let or sell. We estimate expiry as the lodgement date plus 10 years.

When the certificates lapse

Buildings over 1,000 m², by when their latest EPC lapses, at 30 Sep 2026.

Redcar and Cleveland: when each building's latest EPC lapses (estimated)
EPC lapsesAll buildingsRated C to GC to G floor area
Already lapsed88587k sq ft54,529 m²
Rest of 20261115k sq ft1,403 m²
In 20271128k sq ft2,624 m²
In 202877300k sq ft27,888 m²
In 20292247k sq ft4,363 m²
In 2030000 sq ft0 m²
2031 or later2815479k sq ft44,519 m²

New EPCs in the last year

Industrial and warehouse buildings of any size whose latest EPC was lodged in the 12 months to 30 Sep 2026, by the reason on the certificate.

To let
9buildings
Marketed sale
2buildings
New build
2buildings
Other reasons
1building

14 in all: 64% to let, against 56% across England and Wales. How the daily feed works

Uses, heating and recommendations

What the buildings are used for, how they're heated, and what assessors recommended on the certificates of those rated C to G.

By use

Use from the EPC's property type.

Redcar and Cleveland: buildings over 1,000 m² by use, from the EPC's property type
UseBuildingsB or betterC to EF or GC to E floor area
Storage and distribution (B8)954093k sq ft8,672 m²
General industrial (B2)3882731.2m sq ft110,125 m²

By main heating fuel

As recorded on each building's latest EPC.

Redcar and Cleveland: buildings over 1,000 m² by main heating fuel on the EPC
Main heating fuelBuildingsShareEngland and Wales
Grid supplied electricity1940%37%
Natural gas1940%53%
Other715%4%
Oil24%4%

What assessors recommend

The five most common on the latest certificates of its 34 buildings rated C to G, in the register's wording. A recommendation is the assessor's, not a requirement.

  1. 01

    Consider replacing T8 lamps with retrofit T5 conversion kit.

    EPC-L5. On 28 of 34 buildings (82%)

  2. 02

    Introduce HF (high frequency) ballasts for fluorescent tubes: Reduced number of fittings required.

    EPC-L7. On 23 of 34 buildings (68%)

  3. 03

    In some spaces, the solar gain limit defined in the NCM is exceeded, which might cause overheating. Consider solar control measures such as the application of reflective coating or shading devices to windows.

    EPC-V1. On 22 of 34 buildings (65%)

  4. 04

    Some windows have high U-values - consider installing secondary glazing.

    EPC-E5. On 21 of 34 buildings (62%)

  5. 05

    Add optimum start/stop to the heating system.

    EPC-H7. On 21 of 34 buildings (62%)

How Redcar and Cleveland compares

Redcar and Cleveland has 0.1% of the industrial floorspace rated C to E in England and Wales. 72% of its buildings over 1,000 m² are below B, against 75% across the North East and 70% nationally.

Against the region and the country

Redcar and Cleveland against the North East and England and Wales: industrial and warehouse buildings over 1,000 m²
AreaOver 1,000 m²Rated C to EC to E floor areaRated F or GShare below B
Redcar and Cleveland47311.3m sq ft118,797 m²372%
North East1,7101,21347.8m sq ft4,439,776 m²6375%
England and Wales38,14825,6191.01bn sq ft94,020,657 m²1,03770%

Nearby in the North East ranking

Local authorities ranked next to Redcar and Cleveland in the North East by floorspace rated C to E
RankLocal authorityC to E floor area
8Newcastle upon Tyne2.6m sq ft245,134 m²
9South Tyneside1.7m sq ft162,562 m²
10Hartlepool1.5m sq ft141,039 m²
11Redcar and Cleveland1.3m sq ft118,797 m²
12Middlesbrough976k sq ft90,698 m²

What the 2031 proposal means

In June 2026 the government said it intends that privately rented non-domestic buildings over 1,000 m² reach EPC B from 2031, where cost effective. It needs secondary legislation, so for now it's a proposal, not law. What the proposal means

  • C to E: fine today, short of B

    Redcar and Cleveland has 31 buildings over 1,000 m² rated C to E. They meet today's E minimum, but would fall short of B if the proposal becomes law while they're let.
  • F or G: below the minimum already

    3 buildings in Redcar and Cleveland are rated F or G. If let, they already need an improvement or a registered exemption under today's rules.
  • Where cost effective, and only when let

    The 7-year payback test and the exemptions remain. Owner-occupied buildings are counted too, as an EPC can't say whether a building is let. Local weights and measures authorities enforce the rules. MEES in plain English
  • Ratings change at renewal

    19 of Redcar and Cleveland's buildings rated C to G have an EPC that has lapsed or is estimated to lapse before 2031. Each needs a new certificate before it's let or sold, and the new rating may differ.

Go building by building

  • One building at a time

    Search by postcode or estate name for each industrial building's rating, floor area, certificate expiry and whether it's over 1,000 m². Free, and you can save five buildings to a free account.

    Check a building in Redcar and Cleveland
  • The whole local authority

    Professional's area screens list every industrial building over 1,000 m² in a local authority with its rating and expiry, for 3 local authorities. £79 a month, or £790 a year.

    Compare plans

The Industrial EPC Weekly

Last week's new industrial EPCs by region, every Monday. Free.