Skip to content

South East

MEES 2031 exposure in Wealden

29 of the 48 industrial and warehouse buildings over 1,000 m² in Wealden with an EPC are rated C to E: 669k sq ft (62,112 m²) of floorspace that meets today's E minimum but falls short of the proposed EPC B standard.

Free. No card needed.

Wealden in figures

EPC register, snapshot 30 Sep 2026

Rated C to E
669k sq ft62,112 m² in 29 buildings
Rated F or G
0 buildingsNone below today's E minimum
Rated A+ to B
19 buildingsAlready at the proposed standard
Share below B
60%Of 48 buildings over 1,000 m². England and Wales: 70%

Wealden has the 282nd most floorspace rated C to E of 316 local authorities in England and Wales, and the 49th most of 64 in the South East.

EPC rating mix

Share of buildings over 1,000 m², by latest EPC rating

  • Wealden48 buildings
  • South East5,119 buildings
  • England and Wales38,148 buildings
Key: Rated A+–B: At B or better alreadyRated C–E: Meets today's E minimum, short of BRated F–G: Below today's E minimum

Latest certificate per building from the government's EPC register, snapshot 30 Sep 2026. Industrial and warehouse uses (B2 and B8), floor area over 1,000 m² as declared on the EPC; 1 m² is 10.7639 sq ft. How we count it

What stands out in Wealden

Compared with the other 63 local authorities in the South East and with England and Wales, from the same EPC register snapshot.

  • None of its buildings over 1,000 m² is rated F or G, as in 30 of the other 63 local authorities in the South East.
  • Most of its floorspace rated C to E, 79% or 527k sq ft (48,925 m²), is in 27 buildings of 1,000 to 5,000 m².
  • 16 of its 29 buildings rated C to G (55%) have an EPC that has lapsed or is estimated to lapse before 2031, against 54% across England and Wales; 7 have already lapsed.
  • 5 of its 14 C-rated buildings (36%) have an asset rating of 51 to 60, within 10 points of band B: 103k sq ft (9,526 m²) of floorspace. Across England and Wales it's 37%.
  • More of its buildings are heated mainly by grid electricity (46%) than by gas (42%); across England and Wales gas leads, 53% to 37%.
  • In the 12 months to 30 Sep 2026, 34 industrial and warehouse buildings of any size here had an EPC lodged to be let and 7 for a marketed sale, 41 in all: the 9th most of 64 local authorities in the South East.
  • Two recommendations are joint most common on its certificates rated C to G, each on 18 of 29 buildings: “Carry out a pressure test, identify and treat identified air leakage. Enter result in EPC calculation” (EPC-E7) and “Consider replacing T8 lamps with retrofit T5 conversion kit” (EPC-L5).

Every rating, A+ to G

Wealden's 48 industrial and warehouse buildings over 1,000 m² by latest EPC rating, beside the South East and the whole of England and Wales.

By latest EPC rating

Share is of buildings over 1,000 m² in each area.

Wealden: industrial and warehouse buildings over 1,000 m² by latest EPC rating, with the share in each band and South East's and England and Wales's
RatingBuildingsFloor areaShareSouth EastEngland and Wales
A+00 sq ft0 m²0%3%2%
A112k sq ft1,069 m²2%13%10%
B18365k sq ft33,928 m²38%22%19%
C14391k sq ft36,309 m²29%35%36%
D13251k sq ft23,287 m²27%21%22%
E227k sq ft2,516 m²4%6%9%
F00 sq ft0 m²0%1%1%
G00 sq ft0 m²0%1%2%

Within 10 points of B

Rated C with an asset rating of 51 to 60. Band B ends at 50.

5 buildings

Of 14 rated C (36%), with 103k sq ft (9,526 m²) of floorspace. England and Wales: 37% of C-rated buildings.

By building size

Floor area as declared on the EPC.

Wealden: industrial and warehouse buildings by floor area
Floor areaBuildingsRated B or betterC to E floor area
Over 1,000 to 5,000 m²4641%19 of 46527k sq ft48,925 m²
Over 5,000 to 10,000 m²20%0 of 2142k sq ft13,187 m²
Over 10,000 m²0–0 of 00 sq ft0 m²

Certificates and lettings

An EPC lasts 10 years, and a valid one is needed to let or sell. We estimate expiry as the lodgement date plus 10 years.

When the certificates lapse

Buildings over 1,000 m², by when their latest EPC lapses, at 30 Sep 2026.

Wealden: when each building's latest EPC lapses (estimated)
EPC lapsesAll buildingsRated C to GC to G floor area
Already lapsed77117k sq ft10,824 m²
Rest of 2026000 sq ft0 m²
In 20272269k sq ft6,373 m²
In 20283229k sq ft2,720 m²
In 202954143k sq ft13,253 m²
In 20301115k sq ft1,426 m²
2031 or later3013296k sq ft27,516 m²

New EPCs in the last year

Industrial and warehouse buildings of any size whose latest EPC was lodged in the 12 months to 30 Sep 2026, by the reason on the certificate.

To let
34buildings
Marketed sale
7buildings
New build
7buildings
Other reasons
7buildings

55 in all: 62% to let, against 56% across England and Wales. How the daily feed works

Uses, heating and recommendations

What the buildings are used for, how they're heated, and what assessors recommended on the certificates of those rated C to G.

By use

Use from the EPC's property type.

Wealden: buildings over 1,000 m² by use, from the EPC's property type
UseBuildingsB or betterC to EF or GC to E floor area
Storage and distribution (B8)2812160307k sq ft28,519 m²
General industrial (B2)207130362k sq ft33,593 m²

By main heating fuel

As recorded on each building's latest EPC.

Wealden: buildings over 1,000 m² by main heating fuel on the EPC
Main heating fuelBuildingsShareEngland and Wales
Grid supplied electricity2246%37%
Natural gas2042%53%
Oil36%4%
Biomass24%1%
Other12%4%

What assessors recommend

The five most common on the latest certificates of its 29 buildings rated C to G, in the register's wording. A recommendation is the assessor's, not a requirement.

  1. 01

    Carry out a pressure test, identify and treat identified air leakage. Enter result in EPC calculation.

    EPC-E7. On 18 of 29 buildings (62%)

  2. 02

    Consider replacing T8 lamps with retrofit T5 conversion kit.

    EPC-L5. On 18 of 29 buildings (62%)

  3. 03

    Introduce HF (high frequency) ballasts for fluorescent tubes: Reduced number of fittings required.

    EPC-L7. On 16 of 29 buildings (55%)

  4. 04

    In some spaces, the solar gain limit defined in the NCM is exceeded, which might cause overheating. Consider solar control measures such as the application of reflective coating or shading devices to windows.

    EPC-V1. On 16 of 29 buildings (55%)

  5. 05

    Add weather compensation controls to heating system.

    EPC-H8. On 14 of 29 buildings (48%)

How Wealden compares

Wealden has less than 0.1% of the industrial floorspace rated C to E in England and Wales. 60% of its buildings over 1,000 m² are below B, against 63% across the South East and 70% nationally.

Against the region and the country

Wealden against the South East and England and Wales: industrial and warehouse buildings over 1,000 m²
AreaOver 1,000 m²Rated C to EC to E floor areaRated F or GShare below B
Wealden4829669k sq ft62,112 m²060%
South East5,1193,153101.6m sq ft9,439,390 m²6663%
England and Wales38,14825,6191.01bn sq ft94,020,657 m²1,03770%

Nearby in the South East ranking

Local authorities ranked next to Wealden in the South East by floorspace rated C to E
RankLocal authorityC to E floor area
47Bracknell Forest725k sq ft67,383 m²
48Reigate and Banstead679k sq ft63,127 m²
49Wealden669k sq ft62,112 m²
50Folkestone and Hythe655k sq ft60,865 m²
51Oxford609k sq ft56,547 m²

What the 2031 proposal means

In June 2026 the government said it intends that privately rented non-domestic buildings over 1,000 m² reach EPC B from 2031, where cost effective. It needs secondary legislation, so for now it's a proposal, not law. What the proposal means

  • C to E: fine today, short of B

    Wealden has 29 buildings over 1,000 m² rated C to E. They meet today's E minimum, but would fall short of B if the proposal becomes law while they're let.
  • F or G: below the minimum already

    No building over 1,000 m² in Wealden has a latest EPC rated F or G.
  • Where cost effective, and only when let

    The 7-year payback test and the exemptions remain. Owner-occupied buildings are counted too, as an EPC can't say whether a building is let. Local weights and measures authorities enforce the rules. MEES in plain English
  • Ratings change at renewal

    16 of Wealden's buildings rated C to G have an EPC that has lapsed or is estimated to lapse before 2031. Each needs a new certificate before it's let or sold, and the new rating may differ.

Go building by building

  • One building at a time

    Search by postcode or estate name for each industrial building's rating, floor area, certificate expiry and whether it's over 1,000 m². Free, and you can save five buildings to a free account.

    Check a building in Wealden
  • The whole local authority

    Professional's area screens list every industrial building over 1,000 m² in a local authority with its rating and expiry, for 3 local authorities. £79 a month, or £790 a year.

    Compare plans

The Industrial EPC Weekly

Last week's new industrial EPCs by region, every Monday. Free.