Skip to content

West Midlands

MEES 2031 exposure in Worcester

43 of the 62 industrial and warehouse buildings over 1,000 m² in Worcester with an EPC are rated C to E: 1.7m sq ft (158,165 m²) of floorspace that meets today's E minimum but falls short of the proposed EPC B standard.

Free. No card needed.

Worcester in figures

EPC register, snapshot 30 Sep 2026

Rated C to E
1.7m sq ft158,165 m² in 43 buildings
Rated F or G
1 building19k sq ft (1,723 m²), below today's E minimum
Rated A+ to B
18 buildingsAlready at the proposed standard
Share below B
71%Of 62 buildings over 1,000 m². England and Wales: 70%

Worcester has the 187th most floorspace rated C to E of 316 local authorities in England and Wales, and the 26th most of 30 in the West Midlands.

EPC rating mix

Share of buildings over 1,000 m², by latest EPC rating

  • Worcester62 buildings
  • West Midlands5,308 buildings
  • England and Wales38,148 buildings
Key: Rated A+–B: At B or better alreadyRated C–E: Meets today's E minimum, short of BRated F–G: Below today's E minimum

Latest certificate per building from the government's EPC register, snapshot 30 Sep 2026. Industrial and warehouse uses (B2 and B8), floor area over 1,000 m² as declared on the EPC; 1 m² is 10.7639 sq ft. How we count it

What stands out in Worcester

Compared with the other 29 local authorities in the West Midlands and with England and Wales, from the same EPC register snapshot.

  • Its floorspace rated C to E is spread across sizes: 47% in buildings of 1,000 to 5,000 m², 14% in buildings of 5,000 to 10,000 m², 40% in buildings over 10,000 m².
  • Its largest buildings are likelier to meet B: 63% of the 8 over 10,000 m² are rated B or better, against 22% of those of 1,000 to 5,000 m².
  • 20 of its 44 buildings rated C to G (45%) have an EPC that has lapsed or is estimated to lapse before 2031, against 54% across England and Wales; 6 have already lapsed.
  • 10 of its 25 C-rated buildings (40%) have an asset rating of 51 to 60, within 10 points of band B: 787k sq ft (73,112 m²) of floorspace. Across England and Wales it's 37%.
  • Storage and distribution (B8) makes up 71% of its buildings over 1,000 m², against 58% across England and Wales.
  • More of its buildings are heated mainly by grid electricity (52%) than by gas (47%); across England and Wales gas leads, 53% to 37%.
  • In the 12 months to 30 Sep 2026, 15 industrial and warehouse buildings of any size here had an EPC lodged to be let and 5 for a marketed sale, 20 in all: the 4th fewest of 30 local authorities in the West Midlands.
  • The recommendation lodged most often on its certificates rated C to G is “Consider installing PV” (EPC-R4), on 28 of 44 buildings.

Every rating, A+ to G

Worcester's 62 industrial and warehouse buildings over 1,000 m² by latest EPC rating, beside the West Midlands and the whole of England and Wales.

By latest EPC rating

Share is of buildings over 1,000 m² in each area.

Worcester: industrial and warehouse buildings over 1,000 m² by latest EPC rating, with the share in each band and West Midlands's and England and Wales's
RatingBuildingsFloor areaShareWest MidlandsEngland and Wales
A+00 sq ft0 m²0%1%2%
A7515k sq ft47,889 m²11%9%10%
B11642k sq ft59,642 m²18%17%19%
C251.3m sq ft118,519 m²40%37%36%
D15320k sq ft29,702 m²24%23%22%
E3107k sq ft9,944 m²5%9%9%
F00 sq ft0 m²0%1%1%
G119k sq ft1,723 m²2%2%2%

Within 10 points of B

Rated C with an asset rating of 51 to 60. Band B ends at 50.

10 buildings

Of 25 rated C (40%), with 787k sq ft (73,112 m²) of floorspace. England and Wales: 37% of C-rated buildings.

By building size

Floor area as declared on the EPC.

Worcester: industrial and warehouse buildings by floor area
Floor areaBuildingsRated B or betterC to E floor area
Over 1,000 to 5,000 m²4922%11 of 49795k sq ft73,878 m²
Over 5,000 to 10,000 m²540%2 of 5233k sq ft21,628 m²
Over 10,000 m²863%5 of 8674k sq ft62,659 m²

Certificates and lettings

An EPC lasts 10 years, and a valid one is needed to let or sell. We estimate expiry as the lodgement date plus 10 years.

When the certificates lapse

Buildings over 1,000 m², by when their latest EPC lapses, at 30 Sep 2026.

Worcester: when each building's latest EPC lapses (estimated)
EPC lapsesAll buildingsRated C to GC to G floor area
Already lapsed66288k sq ft26,757 m²
Rest of 20263370k sq ft6,529 m²
In 20273225k sq ft2,356 m²
In 20281113k sq ft1,247 m²
In 20292113k sq ft1,229 m²
In 2030127210k sq ft19,547 m²
2031 or later35241.1m sq ft102,223 m²

New EPCs in the last year

Industrial and warehouse buildings of any size whose latest EPC was lodged in the 12 months to 30 Sep 2026, by the reason on the certificate.

To let
15buildings
Marketed sale
5buildings
New build
0buildings
Other reasons
0buildings

20 in all: 75% to let, against 56% across England and Wales. How the daily feed works

Uses, heating and recommendations

What the buildings are used for, how they're heated, and what assessors recommended on the certificates of those rated C to G.

By use

Use from the EPC's property type.

Worcester: buildings over 1,000 m² by use, from the EPC's property type
UseBuildingsB or betterC to EF or GC to E floor area
Storage and distribution (B8)44172611.2m sq ft113,446 m²
General industrial (B2)181170481k sq ft44,719 m²

By main heating fuel

As recorded on each building's latest EPC.

Worcester: buildings over 1,000 m² by main heating fuel on the EPC
Main heating fuelBuildingsShareEngland and Wales
Grid supplied electricity3252%37%
Natural gas2947%53%
Other12%4%

What assessors recommend

The five most common on the latest certificates of its 44 buildings rated C to G, in the register's wording. A recommendation is the assessor's, not a requirement.

  1. 01

    Consider installing PV.

    EPC-R4. On 28 of 44 buildings (64%)

  2. 02

    Consider installing solar water heating.

    EPC-R3. On 27 of 44 buildings (61%)

  3. 03

    Some windows have high U-values - consider installing secondary glazing.

    EPC-E5. On 26 of 44 buildings (59%)

  4. 04

    Add optimum start/stop to the heating system.

    EPC-H7. On 26 of 44 buildings (59%)

  5. 05

    Consider replacing T8 lamps with retrofit T5 conversion kit.

    EPC-L5. On 25 of 44 buildings (57%)

How Worcester compares

Worcester has 0.2% of the industrial floorspace rated C to E in England and Wales. 71% of its buildings over 1,000 m² are below B, against 73% across the West Midlands and 70% nationally.

Against the region and the country

Worcester against the West Midlands and England and Wales: industrial and warehouse buildings over 1,000 m²
AreaOver 1,000 m²Rated C to EC to E floor areaRated F or GShare below B
Worcester62431.7m sq ft158,165 m²171%
West Midlands5,3083,687149.0m sq ft13,840,829 m²17173%
England and Wales38,14825,6191.01bn sq ft94,020,657 m²1,03770%

Nearby in the West Midlands ranking

Local authorities ranked next to Worcester in the West Midlands by floorspace rated C to E
RankLocal authorityC to E floor area
24County of Herefordshire2.4m sq ft219,700 m²
25Cannock Chase2.1m sq ft195,554 m²
26Worcester1.7m sq ft158,165 m²
27South Staffordshire1.6m sq ft153,261 m²
28Bromsgrove938k sq ft87,116 m²

What the 2031 proposal means

In June 2026 the government said it intends that privately rented non-domestic buildings over 1,000 m² reach EPC B from 2031, where cost effective. It needs secondary legislation, so for now it's a proposal, not law. What the proposal means

  • C to E: fine today, short of B

    Worcester has 43 buildings over 1,000 m² rated C to E. They meet today's E minimum, but would fall short of B if the proposal becomes law while they're let.
  • F or G: below the minimum already

    1 building in Worcester is rated F or G. If let, it already needs an improvement or a registered exemption under today's rules.
  • Where cost effective, and only when let

    The 7-year payback test and the exemptions remain. Owner-occupied buildings are counted too, as an EPC can't say whether a building is let. Local weights and measures authorities enforce the rules. MEES in plain English
  • Ratings change at renewal

    20 of Worcester's buildings rated C to G have an EPC that has lapsed or is estimated to lapse before 2031. Each needs a new certificate before it's let or sold, and the new rating may differ.

Go building by building

  • One building at a time

    Search by postcode or estate name for each industrial building's rating, floor area, certificate expiry and whether it's over 1,000 m². Free, and you can save five buildings to a free account.

    Check a building in Worcester
  • The whole local authority

    Professional's area screens list every industrial building over 1,000 m² in a local authority with its rating and expiry, for 3 local authorities. £79 a month, or £790 a year.

    Compare plans

The Industrial EPC Weekly