Skip to content

London

MEES 2031 exposure in Brent

131 of the 222 industrial and warehouse buildings over 1,000 m² in Brent with an EPC are rated C to E: 5.7m sq ft (526,368 m²) of floorspace that meets today's E minimum but falls short of the proposed EPC B standard.

Free. No card needed.

Brent in figures

EPC register, snapshot 30 Sep 2026

Rated C to E
5.7m sq ft526,368 m² in 131 buildings
Rated F or G
2 buildings109k sq ft (10,171 m²), below today's E minimum
Rated A+ to B
89 buildingsAlready at the proposed standard
Share below B
60%Of 222 buildings over 1,000 m². England and Wales: 70%

Brent has the 50th most floorspace rated C to E of 316 local authorities in England and Wales, and the 4th most of 32 in London.

EPC rating mix

Share of buildings over 1,000 m², by latest EPC rating

  • Brent222 buildings
  • London2,964 buildings
  • England and Wales38,148 buildings
Key: Rated A+–B: At B or better alreadyRated C–E: Meets today's E minimum, short of BRated F–G: Below today's E minimum

Latest certificate per building from the government's EPC register, snapshot 30 Sep 2026. Industrial and warehouse uses (B2 and B8), floor area over 1,000 m² as declared on the EPC; 1 m² is 10.7639 sq ft. How we count it

What stands out in Brent

Compared with the other 31 local authorities in London and with England and Wales, from the same EPC register snapshot.

  • Its floorspace rated C to E is spread across sizes: 42% in buildings of 1,000 to 5,000 m², 14% in buildings of 5,000 to 10,000 m², 44% in buildings over 10,000 m².
  • 79 of its 133 buildings rated C to G (59%) have an EPC that has lapsed or is estimated to lapse before 2031, against 54% across England and Wales; 28 have already lapsed.
  • 32 of its 70 C-rated buildings (46%) have an asset rating of 51 to 60, within 10 points of band B: 1.8m sq ft (163,017 m²) of floorspace. Across England and Wales it's 37%.
  • Storage and distribution (B8) makes up 75% of its buildings over 1,000 m², against 58% across England and Wales.
  • In the 12 months to 30 Sep 2026, 56 industrial and warehouse buildings of any size here had an EPC lodged to be let and 37 for a marketed sale, 93 in all: the most of any local authority in London.
  • The recommendation lodged most often on its certificates rated C to G is “Consider replacing T8 lamps with retrofit T5 conversion kit” (EPC-L5), on 82 of 133 buildings.

Every rating, A+ to G

Brent's 222 industrial and warehouse buildings over 1,000 m² by latest EPC rating, beside London and the whole of England and Wales.

By latest EPC rating

Share is of buildings over 1,000 m² in each area.

Brent: industrial and warehouse buildings over 1,000 m² by latest EPC rating, with the share in each band and London's and England and Wales's
RatingBuildingsFloor areaShareLondonEngland and Wales
A+14497k sq ft46,195 m²6%4%2%
A221.1m sq ft100,747 m²10%11%10%
B532.6m sq ft240,277 m²24%21%19%
C703.4m sq ft314,397 m²32%35%36%
D472.0m sq ft182,060 m²21%21%22%
E14322k sq ft29,911 m²6%7%9%
F00 sq ft0 m²0%1%1%
G2109k sq ft10,171 m²1%1%2%

Within 10 points of B

Rated C with an asset rating of 51 to 60. Band B ends at 50.

32 buildings

Of 70 rated C (46%), with 1.8m sq ft (163,017 m²) of floorspace. England and Wales: 37% of C-rated buildings.

By building size

Floor area as declared on the EPC.

Brent: industrial and warehouse buildings by floor area
Floor areaBuildingsRated B or betterC to E floor area
Over 1,000 to 5,000 m²17436%63 of 1742.4m sq ft220,643 m²
Over 5,000 to 10,000 m²3263%20 of 32804k sq ft74,712 m²
Over 10,000 m²1638%6 of 162.5m sq ft231,013 m²

Certificates and lettings

An EPC lasts 10 years, and a valid one is needed to let or sell. We estimate expiry as the lodgement date plus 10 years.

When the certificates lapse

Buildings over 1,000 m², by when their latest EPC lapses, at 30 Sep 2026.

Brent: when each building's latest EPC lapses (estimated)
EPC lapsesAll buildingsRated C to GC to G floor area
Already lapsed33281.7m sq ft159,658 m²
Rest of 2026000 sq ft0 m²
In 20271412240k sq ft22,343 m²
In 20281513489k sq ft45,459 m²
In 20291311493k sq ft45,763 m²
In 20302015545k sq ft50,601 m²
2031 or later127542.3m sq ft212,715 m²

New EPCs in the last year

Industrial and warehouse buildings of any size whose latest EPC was lodged in the 12 months to 30 Sep 2026, by the reason on the certificate.

To let
56buildings
Marketed sale
37buildings
New build
5buildings
Other reasons
4buildings

102 in all: 55% to let, against 56% across England and Wales. How the daily feed works

Uses, heating and recommendations

What the buildings are used for, how they're heated, and what assessors recommended on the certificates of those rated C to G.

By use

Use from the EPC's property type.

Brent: buildings over 1,000 m² by use, from the EPC's property type
UseBuildingsB or betterC to EF or GC to E floor area
Storage and distribution (B8)167729324.4m sq ft407,580 m²
General industrial (B2)55173801.3m sq ft118,788 m²

By main heating fuel

As recorded on each building's latest EPC.

Brent: buildings over 1,000 m² by main heating fuel on the EPC
Main heating fuelBuildingsShareEngland and Wales
Natural gas12858%53%
Grid supplied electricity9241%37%
Other21%4%

What assessors recommend

The five most common on the latest certificates of its 133 buildings rated C to G, in the register's wording. A recommendation is the assessor's, not a requirement.

  1. 01

    Consider replacing T8 lamps with retrofit T5 conversion kit.

    EPC-L5. On 82 of 133 buildings (62%)

  2. 02

    Consider installing PV.

    EPC-R4. On 67 of 133 buildings (50%)

  3. 03

    Add optimum start/stop to the heating system.

    EPC-H7. On 65 of 133 buildings (49%)

  4. 04

    Introduce HF (high frequency) ballasts for fluorescent tubes: Reduced number of fittings required.

    EPC-L7. On 64 of 133 buildings (48%)

  5. 05

    Consider installing solar water heating.

    EPC-R3. On 60 of 133 buildings (45%)

How Brent compares

Brent has 0.6% of the industrial floorspace rated C to E in England and Wales. 60% of its buildings over 1,000 m² are below B, against 65% across London and 70% nationally.

Against the region and the country

Brent against London and England and Wales: industrial and warehouse buildings over 1,000 m²
AreaOver 1,000 m²Rated C to EC to E floor areaRated F or GShare below B
Brent2221315.7m sq ft526,368 m²260%
London2,9641,87367.2m sq ft6,247,619 m²5365%
England and Wales38,14825,6191.01bn sq ft94,020,657 m²1,03770%

Nearby in the London ranking

Local authorities ranked next to Brent in London by floorspace rated C to E
RankLocal authorityC to E floor area
2Hillingdon6.2m sq ft578,784 m²
3Enfield5.7m sq ft527,112 m²
4Brent5.7m sq ft526,368 m²
5Hounslow4.9m sq ft455,618 m²
6Bexley3.7m sq ft341,171 m²

What the 2031 proposal means

In June 2026 the government said it intends that privately rented non-domestic buildings over 1,000 m² reach EPC B from 2031, where cost effective. It needs secondary legislation, so for now it's a proposal, not law. What the proposal means

  • C to E: fine today, short of B

    Brent has 131 buildings over 1,000 m² rated C to E. They meet today's E minimum, but would fall short of B if the proposal becomes law while they're let.
  • F or G: below the minimum already

    2 buildings in Brent are rated F or G. If let, they already need an improvement or a registered exemption under today's rules.
  • Where cost effective, and only when let

    The 7-year payback test and the exemptions remain. Owner-occupied buildings are counted too, as an EPC can't say whether a building is let. Local weights and measures authorities enforce the rules. MEES in plain English
  • Ratings change at renewal

    79 of Brent's buildings rated C to G have an EPC that has lapsed or is estimated to lapse before 2031. Each needs a new certificate before it's let or sold, and the new rating may differ.

Go building by building

  • One building at a time

    Search by postcode or estate name for each industrial building's rating, floor area, certificate expiry and whether it's over 1,000 m². Free, and you can save five buildings to a free account.

    Check a building in Brent
  • The whole local authority

    Professional's area screens list every industrial building over 1,000 m² in a local authority with its rating and expiry, for 3 local authorities. £79 a month, or £790 a year.

    Compare plans

The Industrial EPC Weekly

Last week's new industrial EPCs by region, every Monday. Free.