MEES 2031 exposure in Greenwich

68 of the 88 industrial and warehouse buildings over 1,000 m² in Greenwich with an EPC are rated C to E: 2.9m sq ft (272,513 m²) of floorspace that meets today's E minimum but falls short of the proposed EPC B standard.

Free. No card needed.

Greenwich in figures

EPC register, snapshot 30 Sep 2026

Rated C to E
2.9m sq ft272,513 m² in 68 buildings
Rated F or G
3 buildings85k sq ft (7,894 m²), below today's E minimum
Rated A+ to B
17 buildingsAlready at the proposed standard
Share below B
81%Of 88 buildings over 1,000 m². England and Wales: 70%

Greenwich has the 114th most floorspace rated C to E of 316 local authorities in England and Wales, and the 8th most of 32 in London.

EPC rating mix

Share of buildings over 1,000 m², by latest EPC rating

  • Greenwich88 buildings
  • London2,964 buildings
  • England and Wales38,148 buildings
Key: Rated A+–B: At B or better alreadyRated C–E: Meets today's E minimum, short of BRated F–G: Below today's E minimum

Latest certificate per building from the government's EPC register, snapshot 30 Sep 2026. Industrial and warehouse uses (B2 and B8), floor area over 1,000 m² as declared on the EPC; 1 m² is 10.7639 sq ft. How we count it

What stands out in Greenwich

Compared with the other 31 local authorities in London and with England and Wales, from the same EPC register snapshot.

  • Its floorspace rated C to E is spread across sizes: 38% in buildings of 1,000 to 5,000 m², 14% in buildings of 5,000 to 10,000 m², 47% in buildings over 10,000 m².
  • Unusually, its smaller buildings do better: 15% of those of 1,000 to 5,000 m² are rated B or better, against 14% of the 7 over 10,000 m².
  • 38 of its 71 buildings rated C to G (54%) have an EPC that has lapsed or is estimated to lapse before 2031, against 54% across England and Wales; 15 have already lapsed.
  • 10 of its 37 C-rated buildings (27%) have an asset rating of 51 to 60, within 10 points of band B: 618k sq ft (57,384 m²) of floorspace. Across England and Wales it's 37%.
  • Storage and distribution (B8) makes up 77% of its buildings over 1,000 m², against 58% across England and Wales.
  • More of its buildings are heated mainly by grid electricity (49%) than by gas (47%); across England and Wales gas leads, 53% to 37%.
  • In the 12 months to 30 Sep 2026, 4 industrial and warehouse buildings of any size here had an EPC lodged to be let and 5 for a marketed sale, 9 in all: the 8th fewest of 32 local authorities in London.
  • The recommendation lodged most often on its certificates rated C to G is “Consider installing PV” (EPC-R4), on 40 of 71 buildings.

Every rating, A+ to G

Greenwich's 88 industrial and warehouse buildings over 1,000 m² by latest EPC rating, beside London and the whole of England and Wales.

By latest EPC rating

Share is of buildings over 1,000 m² in each area.

Greenwich: industrial and warehouse buildings over 1,000 m² by latest EPC rating, with the share in each band and London's and England and Wales's
RatingBuildingsFloor areaShareLondonEngland and Wales
A+00 sq ft0 m²0%4%2%
A4194k sq ft18,007 m²5%11%10%
B13663k sq ft61,629 m²15%21%19%
C372.1m sq ft191,661 m²42%35%36%
D24695k sq ft64,582 m²27%21%22%
E7175k sq ft16,270 m²8%7%9%
F117k sq ft1,624 m²1%1%1%
G267k sq ft6,270 m²2%1%2%

Within 10 points of B

Rated C with an asset rating of 51 to 60. Band B ends at 50.

10 buildings

Of 37 rated C (27%), with 618k sq ft (57,384 m²) of floorspace. England and Wales: 37% of C-rated buildings.

By building size

Floor area as declared on the EPC.

Greenwich: industrial and warehouse buildings by floor area
Floor areaBuildingsRated B or betterC to E floor area
Over 1,000 to 5,000 m²6815%10 of 681.1m sq ft104,462 m²
Over 5,000 to 10,000 m²1346%6 of 13422k sq ft39,175 m²
Over 10,000 m²714%1 of 71.4m sq ft128,876 m²

Certificates and lettings

An EPC lasts 10 years, and a valid one is needed to let or sell. We estimate expiry as the lodgement date plus 10 years.

When the certificates lapse

Buildings over 1,000 m², by when their latest EPC lapses, at 30 Sep 2026.

Greenwich: when each building's latest EPC lapses (estimated)
EPC lapsesAll buildingsRated C to GC to G floor area
Already lapsed1615775k sq ft71,978 m²
Rest of 20262227k sq ft2,513 m²
In 20274476k sq ft7,035 m²
In 2028119342k sq ft31,786 m²
In 20294457k sq ft5,262 m²
In 20305473k sq ft6,752 m²
2031 or later46331.7m sq ft155,081 m²

New EPCs in the last year

Industrial and warehouse buildings of any size whose latest EPC was lodged in the 12 months to 30 Sep 2026, by the reason on the certificate.

To let
4buildings
Marketed sale
5buildings
New build
0buildings
Other reasons
2buildings

11 in all: 36% to let, against 56% across England and Wales. How the daily feed works

Uses, heating and recommendations

What the buildings are used for, how they're heated, and what assessors recommended on the certificates of those rated C to G.

By use

Use from the EPC's property type.

Greenwich: buildings over 1,000 m² by use, from the EPC's property type
UseBuildingsB or betterC to EF or GC to E floor area
Storage and distribution (B8)68155212.6m sq ft241,454 m²
General industrial (B2)202162334k sq ft31,059 m²

By main heating fuel

As recorded on each building's latest EPC.

Greenwich: buildings over 1,000 m² by main heating fuel on the EPC
Main heating fuelBuildingsShareEngland and Wales
Grid supplied electricity4349%37%
Natural gas4147%53%
Other45%4%

What assessors recommend

The five most common on the latest certificates of its 71 buildings rated C to G, in the register's wording. A recommendation is the assessor's, not a requirement.

  1. 01

    Consider installing PV.

    EPC-R4. On 40 of 71 buildings (56%)

  2. 02

    Consider replacing T8 lamps with retrofit T5 conversion kit.

    EPC-L5. On 38 of 71 buildings (54%)

  3. 03

    Introduce HF (high frequency) ballasts for fluorescent tubes: Reduced number of fittings required.

    EPC-L7. On 32 of 71 buildings (45%)

  4. 04

    In some spaces, the solar gain limit defined in the NCM is exceeded, which might cause overheating. Consider solar control measures such as the application of reflective coating or shading devices to windows.

    EPC-V1. On 30 of 71 buildings (42%)

  5. 05

    Add optimum start/stop to the heating system.

    EPC-H7. On 29 of 71 buildings (41%)

How Greenwich compares

Greenwich has 0.3% of the industrial floorspace rated C to E in England and Wales. 81% of its buildings over 1,000 m² are below B, against 65% across London and 70% nationally.

Against the region and the country

Greenwich against London and England and Wales: industrial and warehouse buildings over 1,000 m²
AreaOver 1,000 m²Rated C to EC to E floor areaRated F or GShare below B
Greenwich88682.9m sq ft272,513 m²381%
London2,9641,87367.2m sq ft6,247,619 m²5365%
England and Wales38,14825,6191.01bn sq ft94,020,657 m²1,03770%

Nearby in the London ranking

Local authorities ranked next to Greenwich in London by floorspace rated C to E
RankLocal authorityC to E floor area
6Bexley3.7m sq ft341,171 m²
7Barking and Dagenham3.1m sq ft287,628 m²
8Greenwich2.9m sq ft272,513 m²
9Havering2.4m sq ft218,626 m²
10Newham2.3m sq ft210,817 m²

What the 2031 proposal means

In June 2026 the government said it intends that privately rented non-domestic buildings over 1,000 m² reach EPC B from 2031, where cost effective. It needs secondary legislation, so for now it's a proposal, not law. What the proposal means

  • C to E: fine today, short of B

    Greenwich has 68 buildings over 1,000 m² rated C to E. They meet today's E minimum, but would fall short of B if the proposal becomes law while they're let.
  • F or G: below the minimum already

    3 buildings in Greenwich are rated F or G. If let, they already need an improvement or a registered exemption under today's rules.
  • Where cost effective, and only when let

    The 7-year payback test and the exemptions remain. Owner-occupied buildings are counted too, as an EPC can't say whether a building is let. Local weights and measures authorities enforce the rules. MEES in plain English
  • Ratings change at renewal

    38 of Greenwich's buildings rated C to G have an EPC that has lapsed or is estimated to lapse before 2031. Each needs a new certificate before it's let or sold, and the new rating may differ.

Go building by building

  • One building at a time

    Search by postcode or estate name for each industrial building's rating, floor area, certificate expiry and whether it's over 1,000 m². Free, and you can save five buildings to a free account.

    Check a building in Greenwich
  • The whole local authority

    Professional's area screens list every industrial building over 1,000 m² in a local authority with its rating and expiry, for 3 local authorities. £79 a month, or £790 a year.

    Compare plans

The Industrial EPC Weekly

Last week's new industrial EPCs by region, every Monday. Free.