MEES 2031 exposure in Hammersmith and Fulham

17 of the 26 industrial and warehouse buildings over 1,000 m² in Hammersmith and Fulham with an EPC are rated C to E: 726k sq ft (67,457 m²) of floorspace that meets today's E minimum but falls short of the proposed EPC B standard.

Free. No card needed.

Hammersmith and Fulham in figures

EPC register, snapshot 30 Sep 2026

Rated C to E
726k sq ft67,457 m² in 17 buildings
Rated F or G
3 buildings628k sq ft (58,368 m²), below today's E minimum
Rated A+ to B
6 buildingsAlready at the proposed standard
Share below B
77%Of 26 buildings over 1,000 m². England and Wales: 70%

Hammersmith and Fulham has the 275th most floorspace rated C to E of 316 local authorities in England and Wales, and the 26th most of 32 in London.

EPC rating mix

Share of buildings over 1,000 m², by latest EPC rating

  • Hammersmith and Fulham26 buildings
  • London2,964 buildings
  • England and Wales38,148 buildings
Key: Rated A+–B: At B or better alreadyRated C–E: Meets today's E minimum, short of BRated F–G: Below today's E minimum

Latest certificate per building from the government's EPC register, snapshot 30 Sep 2026. Industrial and warehouse uses (B2 and B8), floor area over 1,000 m² as declared on the EPC; 1 m² is 10.7639 sq ft. How we count it

What stands out in Hammersmith and Fulham

Compared with the other 31 local authorities in London and with England and Wales, from the same EPC register snapshot.

  • Hammersmith and Fulham has a higher share of buildings rated F or G (12%) than any other local authority in London, against 3% across England and Wales.
  • Its floorspace rated C to E is spread across sizes: 45% in buildings of 1,000 to 5,000 m², 17% in buildings of 5,000 to 10,000 m², 38% in buildings over 10,000 m².
  • Its largest buildings are likelier to meet B: 33% of the 6 over 10,000 m² are rated B or better, against 13% of those of 1,000 to 5,000 m².
  • 6 of its 20 buildings rated C to G (30%) have an EPC that has lapsed or is estimated to lapse before 2031, against 54% across England and Wales; 5 have already lapsed.
  • 5 of its 13 C-rated buildings (38%) have an asset rating of 51 to 60, within 10 points of band B: 262k sq ft (24,327 m²) of floorspace. Across England and Wales it's 37%.
  • Storage and distribution (B8) makes up 88% of its buildings over 1,000 m², against 58% across England and Wales.
  • In the 12 months to 30 Sep 2026, 7 industrial and warehouse buildings of any size here had an EPC lodged to be let and 19 for a marketed sale, 26 in all: the 15th most of 32 local authorities in London.
  • The recommendation lodged most often on its certificates rated C to G is “Consider replacing T8 lamps with retrofit T5 conversion kit” (EPC-L5), on 14 of 20 buildings.

Every rating, A+ to G

Hammersmith and Fulham's 26 industrial and warehouse buildings over 1,000 m² by latest EPC rating, beside London and the whole of England and Wales.

By latest EPC rating

Share is of buildings over 1,000 m² in each area.

Hammersmith and Fulham: industrial and warehouse buildings over 1,000 m² by latest EPC rating, with the share in each band and London's and England and Wales's
RatingBuildingsFloor areaShareLondonEngland and Wales
A+00 sq ft0 m²0%4%2%
A2502k sq ft46,596 m²8%11%10%
B4195k sq ft18,145 m²15%21%19%
C13478k sq ft44,388 m²50%35%36%
D3234k sq ft21,754 m²12%21%22%
E114k sq ft1,315 m²4%7%9%
F1372k sq ft34,561 m²4%1%1%
G2256k sq ft23,807 m²8%1%2%

Within 10 points of B

Rated C with an asset rating of 51 to 60. Band B ends at 50.

5 buildings

Of 13 rated C (38%), with 262k sq ft (24,327 m²) of floorspace. England and Wales: 37% of C-rated buildings.

By building size

Floor area as declared on the EPC.

Hammersmith and Fulham: industrial and warehouse buildings by floor area
Floor areaBuildingsRated B or betterC to E floor area
Over 1,000 to 5,000 m²1613%2 of 16327k sq ft30,374 m²
Over 5,000 to 10,000 m²450%2 of 4120k sq ft11,188 m²
Over 10,000 m²633%2 of 6279k sq ft25,895 m²

Certificates and lettings

An EPC lasts 10 years, and a valid one is needed to let or sell. We estimate expiry as the lodgement date plus 10 years.

When the certificates lapse

Buildings over 1,000 m², by when their latest EPC lapses, at 30 Sep 2026.

Hammersmith and Fulham: when each building's latest EPC lapses (estimated)
EPC lapsesAll buildingsRated C to GC to G floor area
Already lapsed65341k sq ft31,712 m²
Rest of 2026000 sq ft0 m²
In 2027000 sq ft0 m²
In 2028000 sq ft0 m²
In 20291115k sq ft1,429 m²
In 2030000 sq ft0 m²
2031 or later1914998k sq ft92,684 m²

New EPCs in the last year

Industrial and warehouse buildings of any size whose latest EPC was lodged in the 12 months to 30 Sep 2026, by the reason on the certificate.

To let
7buildings
Marketed sale
19buildings
New build
0buildings
Other reasons
1building

27 in all: 26% to let, against 56% across England and Wales. How the daily feed works

Uses, heating and recommendations

What the buildings are used for, how they're heated, and what assessors recommended on the certificates of those rated C to G.

By use

Use from the EPC's property type.

Hammersmith and Fulham: buildings over 1,000 m² by use, from the EPC's property type
UseBuildingsB or betterC to EF or GC to E floor area
Storage and distribution (B8)235153547k sq ft50,817 m²
General industrial (B2)3120179k sq ft16,640 m²

By main heating fuel

As recorded on each building's latest EPC.

Hammersmith and Fulham: buildings over 1,000 m² by main heating fuel on the EPC
Main heating fuelBuildingsShareEngland and Wales
Natural gas1558%53%
Grid supplied electricity831%37%
Other28%4%
Oil14%4%

What assessors recommend

The five most common on the latest certificates of its 20 buildings rated C to G, in the register's wording. A recommendation is the assessor's, not a requirement.

  1. 01

    Consider replacing T8 lamps with retrofit T5 conversion kit.

    EPC-L5. On 14 of 20 buildings (70%)

  2. 02

    Consider installing building mounted wind turbine(s).

    EPC-R2. On 12 of 20 buildings (60%)

  3. 03

    Consider installing solar water heating.

    EPC-R3. On 12 of 20 buildings (60%)

  4. 04

    In some spaces, the solar gain limit defined in the NCM is exceeded, which might cause overheating. Consider solar control measures such as the application of reflective coating or shading devices to windows.

    EPC-V1. On 11 of 20 buildings (55%)

  5. 05

    Some windows have high U-values - consider installing secondary glazing.

    EPC-E5. On 10 of 20 buildings (50%)

How Hammersmith and Fulham compares

Hammersmith and Fulham has less than 0.1% of the industrial floorspace rated C to E in England and Wales. 77% of its buildings over 1,000 m² are below B, against 65% across London and 70% nationally.

Against the region and the country

Hammersmith and Fulham against London and England and Wales: industrial and warehouse buildings over 1,000 m²
AreaOver 1,000 m²Rated C to EC to E floor areaRated F or GShare below B
Hammersmith and Fulham2617726k sq ft67,457 m²377%
London2,9641,87367.2m sq ft6,247,619 m²5365%
England and Wales38,14825,6191.01bn sq ft94,020,657 m²1,03770%

Nearby in the London ranking

Local authorities ranked next to Hammersmith and Fulham in London by floorspace rated C to E
RankLocal authorityC to E floor area
24Lambeth768k sq ft71,364 m²
25Kingston upon Thames740k sq ft68,755 m²
26Hammersmith and Fulham726k sq ft67,457 m²
27Redbridge713k sq ft66,276 m²
28Bromley669k sq ft62,180 m²

What the 2031 proposal means

In June 2026 the government said it intends that privately rented non-domestic buildings over 1,000 m² reach EPC B from 2031, where cost effective. It needs secondary legislation, so for now it's a proposal, not law. What the proposal means

  • C to E: fine today, short of B

    Hammersmith and Fulham has 17 buildings over 1,000 m² rated C to E. They meet today's E minimum, but would fall short of B if the proposal becomes law while they're let.
  • F or G: below the minimum already

    3 buildings in Hammersmith and Fulham are rated F or G. If let, they already need an improvement or a registered exemption under today's rules.
  • Where cost effective, and only when let

    The 7-year payback test and the exemptions remain. Owner-occupied buildings are counted too, as an EPC can't say whether a building is let. Local weights and measures authorities enforce the rules. MEES in plain English
  • Ratings change at renewal

    6 of Hammersmith and Fulham's buildings rated C to G have an EPC that has lapsed or is estimated to lapse before 2031. Each needs a new certificate before it's let or sold, and the new rating may differ.

Go building by building

  • One building at a time

    Search by postcode or estate name for each industrial building's rating, floor area, certificate expiry and whether it's over 1,000 m². Free, and you can save five buildings to a free account.

    Check a building in Hammersmith and Fulham
  • The whole local authority

    Professional's area screens list every industrial building over 1,000 m² in a local authority with its rating and expiry, for 3 local authorities. £79 a month, or £790 a year.

    Compare plans

The Industrial EPC Weekly

Last week's new industrial EPCs by region, every Monday. Free.