MEES 2031 exposure in Bromley

34 of the 63 industrial and warehouse buildings over 1,000 m² in Bromley with an EPC are rated C to E: 669k sq ft (62,180 m²) of floorspace that meets today's E minimum but falls short of the proposed EPC B standard.

Free. No card needed.

Bromley in figures

EPC register, snapshot 30 Sep 2026

Rated C to E
669k sq ft62,180 m² in 34 buildings
Rated F or G
0 buildingsNone below today's E minimum
Rated A+ to B
29 buildingsAlready at the proposed standard
Share below B
54%Of 63 buildings over 1,000 m². England and Wales: 70%

Bromley has the 281st most floorspace rated C to E of 316 local authorities in England and Wales, and the 28th most of 32 in London.

EPC rating mix

Share of buildings over 1,000 m², by latest EPC rating

  • Bromley63 buildings
  • London2,964 buildings
  • England and Wales38,148 buildings
Key: Rated A+–B: At B or better alreadyRated C–E: Meets today's E minimum, short of BRated F–G: Below today's E minimum

Latest certificate per building from the government's EPC register, snapshot 30 Sep 2026. Industrial and warehouse uses (B2 and B8), floor area over 1,000 m² as declared on the EPC; 1 m² is 10.7639 sq ft. How we count it

What stands out in Bromley

Compared with the other 31 local authorities in London and with England and Wales, from the same EPC register snapshot.

  • None of its buildings over 1,000 m² is rated F or G, as in 9 of the other 31 local authorities in London.
  • Most of its floorspace rated C to E, 100% or 669k sq ft (62,180 m²), is in 34 buildings of 1,000 to 5,000 m².
  • 20 of its 34 buildings rated C to G (59%) have an EPC that has lapsed or is estimated to lapse before 2031, against 54% across England and Wales; 7 have already lapsed.
  • 7 of its 21 C-rated buildings (33%) have an asset rating of 51 to 60, within 10 points of band B: 146k sq ft (13,555 m²) of floorspace. Across England and Wales it's 37%.
  • In the 12 months to 30 Sep 2026, 20 industrial and warehouse buildings of any size here had an EPC lodged to be let and 11 for a marketed sale, 31 in all: the 13th most of 32 local authorities in London.
  • The recommendation lodged most often on its certificates rated C to G is “Consider installing PV” (EPC-R4), on 21 of 34 buildings.

Every rating, A+ to G

Bromley's 63 industrial and warehouse buildings over 1,000 m² by latest EPC rating, beside London and the whole of England and Wales.

By latest EPC rating

Share is of buildings over 1,000 m² in each area.

Bromley: industrial and warehouse buildings over 1,000 m² by latest EPC rating, with the share in each band and London's and England and Wales's
RatingBuildingsFloor areaShareLondonEngland and Wales
A+138k sq ft3,571 m²2%4%2%
A10442k sq ft41,106 m²16%11%10%
B18388k sq ft36,082 m²29%21%19%
C21446k sq ft41,398 m²33%35%36%
D11200k sq ft18,625 m²17%21%22%
E223k sq ft2,157 m²3%7%9%
F00 sq ft0 m²0%1%1%
G00 sq ft0 m²0%1%2%

Within 10 points of B

Rated C with an asset rating of 51 to 60. Band B ends at 50.

7 buildings

Of 21 rated C (33%), with 146k sq ft (13,555 m²) of floorspace. England and Wales: 37% of C-rated buildings.

By building size

Floor area as declared on the EPC.

Bromley: industrial and warehouse buildings by floor area
Floor areaBuildingsRated B or betterC to E floor area
Over 1,000 to 5,000 m²5942%25 of 59669k sq ft62,180 m²
Over 5,000 to 10,000 m²3100%3 of 30 sq ft0 m²
Over 10,000 m²1100%1 of 10 sq ft0 m²

Certificates and lettings

An EPC lasts 10 years, and a valid one is needed to let or sell. We estimate expiry as the lodgement date plus 10 years.

When the certificates lapse

Buildings over 1,000 m², by when their latest EPC lapses, at 30 Sep 2026.

Bromley: when each building's latest EPC lapses (estimated)
EPC lapsesAll buildingsRated C to GC to G floor area
Already lapsed87133k sq ft12,387 m²
Rest of 2026000 sq ft0 m²
In 20271120k sq ft1,901 m²
In 20283379k sq ft7,358 m²
In 20299453k sq ft4,888 m²
In 203075101k sq ft9,428 m²
2031 or later3514282k sq ft26,218 m²

New EPCs in the last year

Industrial and warehouse buildings of any size whose latest EPC was lodged in the 12 months to 30 Sep 2026, by the reason on the certificate.

To let
20buildings
Marketed sale
11buildings
New build
1building
Other reasons
5buildings

37 in all: 54% to let, against 56% across England and Wales. How the daily feed works

Uses, heating and recommendations

What the buildings are used for, how they're heated, and what assessors recommended on the certificates of those rated C to G.

By use

Use from the EPC's property type.

Bromley: buildings over 1,000 m² by use, from the EPC's property type
UseBuildingsB or betterC to EF or GC to E floor area
Storage and distribution (B8)3314190298k sq ft27,723 m²
General industrial (B2)3015150371k sq ft34,457 m²

By main heating fuel

As recorded on each building's latest EPC.

Bromley: buildings over 1,000 m² by main heating fuel on the EPC
Main heating fuelBuildingsShareEngland and Wales
Natural gas3759%53%
Grid supplied electricity2337%37%
Biomass23%1%
Oil12%4%

What assessors recommend

The five most common on the latest certificates of its 34 buildings rated C to G, in the register's wording. A recommendation is the assessor's, not a requirement.

  1. 01

    Consider installing PV.

    EPC-R4. On 21 of 34 buildings (62%)

  2. 02

    Add optimum start/stop to the heating system.

    EPC-H7. On 20 of 34 buildings (59%)

  3. 03

    Consider replacing T8 lamps with retrofit T5 conversion kit.

    EPC-L5. On 20 of 34 buildings (59%)

  4. 04

    Consider installing solar water heating.

    EPC-R3. On 19 of 34 buildings (56%)

  5. 05

    Add weather compensation controls to heating system.

    EPC-H8. On 17 of 34 buildings (50%)

How Bromley compares

Bromley has less than 0.1% of the industrial floorspace rated C to E in England and Wales. 54% of its buildings over 1,000 m² are below B, against 65% across London and 70% nationally.

Against the region and the country

Bromley against London and England and Wales: industrial and warehouse buildings over 1,000 m²
AreaOver 1,000 m²Rated C to EC to E floor areaRated F or GShare below B
Bromley6334669k sq ft62,180 m²054%
London2,9641,87367.2m sq ft6,247,619 m²5365%
England and Wales38,14825,6191.01bn sq ft94,020,657 m²1,03770%

Nearby in the London ranking

Local authorities ranked next to Bromley in London by floorspace rated C to E
RankLocal authorityC to E floor area
26Hammersmith and Fulham726k sq ft67,457 m²
27Redbridge713k sq ft66,276 m²
28Bromley669k sq ft62,180 m²
29Harrow564k sq ft52,407 m²
30Lewisham504k sq ft46,834 m²

What the 2031 proposal means

In June 2026 the government said it intends that privately rented non-domestic buildings over 1,000 m² reach EPC B from 2031, where cost effective. It needs secondary legislation, so for now it's a proposal, not law. What the proposal means

  • C to E: fine today, short of B

    Bromley has 34 buildings over 1,000 m² rated C to E. They meet today's E minimum, but would fall short of B if the proposal becomes law while they're let.
  • F or G: below the minimum already

    No building over 1,000 m² in Bromley has a latest EPC rated F or G.
  • Where cost effective, and only when let

    The 7-year payback test and the exemptions remain. Owner-occupied buildings are counted too, as an EPC can't say whether a building is let. Local weights and measures authorities enforce the rules. MEES in plain English
  • Ratings change at renewal

    20 of Bromley's buildings rated C to G have an EPC that has lapsed or is estimated to lapse before 2031. Each needs a new certificate before it's let or sold, and the new rating may differ.

Go building by building

  • One building at a time

    Search by postcode or estate name for each industrial building's rating, floor area, certificate expiry and whether it's over 1,000 m². Free, and you can save five buildings to a free account.

    Check a building in Bromley
  • The whole local authority

    Professional's area screens list every industrial building over 1,000 m² in a local authority with its rating and expiry, for 3 local authorities. £79 a month, or £790 a year.