Skip to content

London

MEES 2031 exposure in Harrow

22 of the 28 industrial and warehouse buildings over 1,000 m² in Harrow with an EPC are rated C to E: 564k sq ft (52,407 m²) of floorspace that meets today's E minimum but falls short of the proposed EPC B standard.

Free. No card needed.

Harrow in figures

EPC register, snapshot 30 Sep 2026

Rated C to E
564k sq ft52,407 m² in 22 buildings
Rated F or G
0 buildingsNone below today's E minimum
Rated A+ to B
6 buildingsAlready at the proposed standard
Share below B
79%Of 28 buildings over 1,000 m². England and Wales: 70%

Harrow has the 291st most floorspace rated C to E of 316 local authorities in England and Wales, and the 29th most of 32 in London.

EPC rating mix

Share of buildings over 1,000 m², by latest EPC rating

  • Harrow28 buildings
  • London2,964 buildings
  • England and Wales38,148 buildings
Key: Rated A+–B: At B or better alreadyRated C–E: Meets today's E minimum, short of BRated F–G: Below today's E minimum

Latest certificate per building from the government's EPC register, snapshot 30 Sep 2026. Industrial and warehouse uses (B2 and B8), floor area over 1,000 m² as declared on the EPC; 1 m² is 10.7639 sq ft. How we count it

What stands out in Harrow

Compared with the other 31 local authorities in London and with England and Wales, from the same EPC register snapshot.

  • None of its buildings over 1,000 m² is rated F or G, as in 9 of the other 31 local authorities in London.
  • Most of its floorspace rated C to E, 59% or 334k sq ft (31,064 m²), is in 19 buildings of 1,000 to 5,000 m².
  • 13 of its 22 buildings rated C to G (59%) have an EPC that has lapsed or is estimated to lapse before 2031, against 54% across England and Wales; 6 have already lapsed.
  • 7 of its 14 C-rated buildings (50%) have an asset rating of 51 to 60, within 10 points of band B: 183k sq ft (17,028 m²) of floorspace. Across England and Wales it's 37%.
  • Storage and distribution (B8) makes up 82% of its buildings over 1,000 m², against 58% across England and Wales.
  • In the 12 months to 30 Sep 2026, 7 industrial and warehouse buildings of any size here had an EPC lodged to be let and 1 for a marketed sale, 8 in all: the 6th fewest of 32 local authorities in London.
  • The recommendation lodged most often on its certificates rated C to G is “Consider replacing T8 lamps with retrofit T5 conversion kit” (EPC-L5), on 12 of 22 buildings.

Every rating, A+ to G

Harrow's 28 industrial and warehouse buildings over 1,000 m² by latest EPC rating, beside London and the whole of England and Wales.

By latest EPC rating

Share is of buildings over 1,000 m² in each area.

Harrow: industrial and warehouse buildings over 1,000 m² by latest EPC rating, with the share in each band and London's and England and Wales's
RatingBuildingsFloor areaShareLondonEngland and Wales
A+00 sq ft0 m²0%4%2%
A358k sq ft5,402 m²11%11%10%
B3159k sq ft14,789 m²11%21%19%
C14427k sq ft39,643 m²50%35%36%
D6102k sq ft9,489 m²21%21%22%
E235k sq ft3,275 m²7%7%9%
F00 sq ft0 m²0%1%1%
G00 sq ft0 m²0%1%2%

Within 10 points of B

Rated C with an asset rating of 51 to 60. Band B ends at 50.

7 buildings

Of 14 rated C (50%), with 183k sq ft (17,028 m²) of floorspace. England and Wales: 37% of C-rated buildings.

By building size

Floor area as declared on the EPC.

Harrow: industrial and warehouse buildings by floor area
Floor areaBuildingsRated B or betterC to E floor area
Over 1,000 to 5,000 m²2421%5 of 24334k sq ft31,064 m²
Over 5,000 to 10,000 m²30%0 of 3230k sq ft21,343 m²
Over 10,000 m²1100%1 of 10 sq ft0 m²

Certificates and lettings

An EPC lasts 10 years, and a valid one is needed to let or sell. We estimate expiry as the lodgement date plus 10 years.

When the certificates lapse

Buildings over 1,000 m², by when their latest EPC lapses, at 30 Sep 2026.

Harrow: when each building's latest EPC lapses (estimated)
EPC lapsesAll buildingsRated C to GC to G floor area
Already lapsed7688k sq ft8,202 m²
Rest of 2026000 sq ft0 m²
In 20271169k sq ft6,400 m²
In 20283355k sq ft5,135 m²
In 20292234k sq ft3,139 m²
In 20301111k sq ft1,042 m²
2031 or later149307k sq ft28,489 m²

New EPCs in the last year

Industrial and warehouse buildings of any size whose latest EPC was lodged in the 12 months to 30 Sep 2026, by the reason on the certificate.

To let
7buildings
Marketed sale
1building
New build
0buildings
Other reasons
4buildings

12 in all: 58% to let, against 56% across England and Wales. How the daily feed works

Uses, heating and recommendations

What the buildings are used for, how they're heated, and what assessors recommended on the certificates of those rated C to G.

By use

Use from the EPC's property type.

Harrow: buildings over 1,000 m² by use, from the EPC's property type
UseBuildingsB or betterC to EF or GC to E floor area
Storage and distribution (B8)235180455k sq ft42,272 m²
General industrial (B2)5140109k sq ft10,135 m²

By main heating fuel

As recorded on each building's latest EPC.

Harrow: buildings over 1,000 m² by main heating fuel on the EPC
Main heating fuelBuildingsShareEngland and Wales
Natural gas1657%53%
Grid supplied electricity1243%37%

What assessors recommend

The five most common on the latest certificates of its 22 buildings rated C to G, in the register's wording. A recommendation is the assessor's, not a requirement.

  1. 01

    Consider replacing T8 lamps with retrofit T5 conversion kit.

    EPC-L5. On 12 of 22 buildings (55%)

  2. 02

    Consider installing solar water heating.

    EPC-R3. On 11 of 22 buildings (50%)

  3. 03

    Consider installing PV.

    EPC-R4. On 11 of 22 buildings (50%)

  4. 04

    Introduce HF (high frequency) ballasts for fluorescent tubes: Reduced number of fittings required.

    EPC-L7. On 10 of 22 buildings (45%)

  5. 05

    Carry out a pressure test, identify and treat identified air leakage. Enter result in EPC calculation.

    EPC-E7. On 8 of 22 buildings (36%)

How Harrow compares

Harrow has less than 0.1% of the industrial floorspace rated C to E in England and Wales. 79% of its buildings over 1,000 m² are below B, against 65% across London and 70% nationally.

Against the region and the country

Harrow against London and England and Wales: industrial and warehouse buildings over 1,000 m²
AreaOver 1,000 m²Rated C to EC to E floor areaRated F or GShare below B
Harrow2822564k sq ft52,407 m²079%
London2,9641,87367.2m sq ft6,247,619 m²5365%
England and Wales38,14825,6191.01bn sq ft94,020,657 m²1,03770%

Nearby in the London ranking

Local authorities ranked next to Harrow in London by floorspace rated C to E
RankLocal authorityC to E floor area
27Redbridge713k sq ft66,276 m²
28Bromley669k sq ft62,180 m²
29Harrow564k sq ft52,407 m²
30Lewisham504k sq ft46,834 m²
31Richmond upon Thames283k sq ft26,273 m²

What the 2031 proposal means

In June 2026 the government said it intends that privately rented non-domestic buildings over 1,000 m² reach EPC B from 2031, where cost effective. It needs secondary legislation, so for now it's a proposal, not law. What the proposal means

  • C to E: fine today, short of B

    Harrow has 22 buildings over 1,000 m² rated C to E. They meet today's E minimum, but would fall short of B if the proposal becomes law while they're let.
  • F or G: below the minimum already

    No building over 1,000 m² in Harrow has a latest EPC rated F or G.
  • Where cost effective, and only when let

    The 7-year payback test and the exemptions remain. Owner-occupied buildings are counted too, as an EPC can't say whether a building is let. Local weights and measures authorities enforce the rules. MEES in plain English
  • Ratings change at renewal

    13 of Harrow's buildings rated C to G have an EPC that has lapsed or is estimated to lapse before 2031. Each needs a new certificate before it's let or sold, and the new rating may differ.

Go building by building

  • One building at a time

    Search by postcode or estate name for each industrial building's rating, floor area, certificate expiry and whether it's over 1,000 m². Free, and you can save five buildings to a free account.

    Check a building in Harrow
  • The whole local authority

    Professional's area screens list every industrial building over 1,000 m² in a local authority with its rating and expiry, for 3 local authorities. £79 a month, or £790 a year.

    Compare plans

The Industrial EPC Weekly

Last week's new industrial EPCs by region, every Monday. Free.