West Midlands
MEES 2031 exposure in Warwick
82 of the 132 industrial and warehouse buildings over 1,000 m² in Warwick with an EPC are rated C to E: 3.5m sq ft (323,459 m²) of floorspace that meets today's E minimum but falls short of the proposed EPC B standard.
Free. No card needed.
Warwick in figures
EPC register, snapshot 30 Sep 2026
- Rated C to E
- 3.5m sq ft323,459 m² in 82 buildings
- Rated F or G
- 6 buildings458k sq ft (42,508 m²), below today's E minimum
- Rated A+ to B
- 44 buildingsAlready at the proposed standard
- Share below B
- 67%Of 132 buildings over 1,000 m². England and Wales: 70%
Warwick has the 94th most floorspace rated C to E of 316 local authorities in England and Wales, and the 14th most of 30 in the West Midlands.
EPC rating mix
Share of buildings over 1,000 m², by latest EPC rating
- Warwick132 buildings33%62%
- West Midlands5,308 buildings27%69%
- England and Wales38,148 buildings30%67%
Latest certificate per building from the government's EPC register, snapshot 30 Sep 2026. Industrial and warehouse uses (B2 and B8), floor area over 1,000 m² as declared on the EPC; 1 m² is 10.7639 sq ft. How we count it
What stands out in Warwick
Compared with the other 29 local authorities in the West Midlands and with England and Wales, from the same EPC register snapshot.
- Its floorspace rated C to E is spread across sizes: 41% in buildings of 1,000 to 5,000 m², 13% in buildings of 5,000 to 10,000 m², 45% in buildings over 10,000 m².
- Its largest buildings are likelier to meet B: 55% of the 20 over 10,000 m² are rated B or better, against 27% of those of 1,000 to 5,000 m².
- 48 of its 88 buildings rated C to G (55%) have an EPC that has lapsed or is estimated to lapse before 2031, against 54% across England and Wales; 21 have already lapsed.
- 13 of its 39 C-rated buildings (33%) have an asset rating of 51 to 60, within 10 points of band B: 615k sq ft (57,165 m²) of floorspace. Across England and Wales it's 37%.
- Storage and distribution (B8) makes up 70% of its buildings over 1,000 m², against 58% across England and Wales.
- In the 12 months to 30 Sep 2026, 19 industrial and warehouse buildings of any size here had an EPC lodged to be let and 5 for a marketed sale, 24 in all: the 7th fewest of 30 local authorities in the West Midlands.
- The recommendation lodged most often on its certificates rated C to G is “Consider replacing T8 lamps with retrofit T5 conversion kit” (EPC-L5), on 61 of 88 buildings.
Every rating, A+ to G
Warwick's 132 industrial and warehouse buildings over 1,000 m² by latest EPC rating, beside the West Midlands and the whole of England and Wales.
By latest EPC rating
Share is of buildings over 1,000 m² in each area.
| Rating | Buildings | Floor area | Share | West Midlands | England and Wales |
|---|---|---|---|---|---|
| A+ | 4 | 418k sq ft38,841 m² | 3% | 1% | 2% |
| A | 24 | 3.1m sq ft288,490 m² | 18% | 9% | 10% |
| B | 16 | 645k sq ft59,953 m² | 12% | 17% | 19% |
| C | 39 | 1.7m sq ft159,885 m² | 30% | 37% | 36% |
| D | 29 | 1.0m sq ft96,619 m² | 22% | 23% | 22% |
| E | 14 | 721k sq ft66,955 m² | 11% | 9% | 9% |
| F | 4 | 413k sq ft38,346 m² | 3% | 1% | 1% |
| G | 2 | 45k sq ft4,162 m² | 2% | 2% | 2% |
Within 10 points of B
Rated C with an asset rating of 51 to 60. Band B ends at 50.
13 buildings
Of 39 rated C (33%), with 615k sq ft (57,165 m²) of floorspace. England and Wales: 37% of C-rated buildings.
By building size
Floor area as declared on the EPC.
| Floor area | Buildings | Rated B or better | C to E floor area |
|---|---|---|---|
| Over 1,000 to 5,000 m² | 98 | 27%26 of 98 | 1.4m sq ft133,677 m² |
| Over 5,000 to 10,000 m² | 14 | 50%7 of 14 | 464k sq ft43,067 m² |
| Over 10,000 m² | 20 | 55%11 of 20 | 1.6m sq ft146,715 m² |
Certificates and lettings
An EPC lasts 10 years, and a valid one is needed to let or sell. We estimate expiry as the lodgement date plus 10 years.
When the certificates lapse
Buildings over 1,000 m², by when their latest EPC lapses, at 30 Sep 2026.
| EPC lapses | All buildings | Rated C to G | C to G floor area |
|---|---|---|---|
| Already lapsed | 22 | 21 | 1.4m sq ft127,487 m² |
| Rest of 2026 | 1 | 1 | 23k sq ft2,137 m² |
| In 2027 | 11 | 6 | 206k sq ft19,160 m² |
| In 2028 | 9 | 8 | 419k sq ft38,953 m² |
| In 2029 | 9 | 7 | 144k sq ft13,414 m² |
| In 2030 | 10 | 5 | 101k sq ft9,372 m² |
| 2031 or later | 70 | 40 | 1.7m sq ft155,444 m² |
New EPCs in the last year
Industrial and warehouse buildings of any size whose latest EPC was lodged in the 12 months to 30 Sep 2026, by the reason on the certificate.
- To let
- 19buildings
- Marketed sale
- 5buildings
- New build
- 1building
- Other reasons
- 10buildings
35 in all: 54% to let, against 56% across England and Wales. How the daily feed works
Uses, heating and recommendations
What the buildings are used for, how they're heated, and what assessors recommended on the certificates of those rated C to G.
By use
Use from the EPC's property type.
| Use | Buildings | B or better | C to E | F or G | C to E floor area |
|---|---|---|---|---|---|
| Storage and distribution (B8) | 92 | 35 | 56 | 1 | 2.7m sq ft250,649 m² |
| General industrial (B2) | 40 | 9 | 26 | 5 | 784k sq ft72,810 m² |
By main heating fuel
As recorded on each building's latest EPC.
| Main heating fuel | Buildings | Share | England and Wales |
|---|---|---|---|
| Natural gas | 73 | 55% | 53% |
| Grid supplied electricity | 48 | 36% | 37% |
| Oil | 4 | 3% | 4% |
| Other | 4 | 3% | 4% |
| LPG | 3 | 2% | 1% |
What assessors recommend
The five most common on the latest certificates of its 88 buildings rated C to G, in the register's wording. A recommendation is the assessor's, not a requirement.
- 01
Consider replacing T8 lamps with retrofit T5 conversion kit.
EPC-L5. On 61 of 88 buildings (69%)
- 02
Consider installing solar water heating.
EPC-R3. On 57 of 88 buildings (65%)
- 03
Carry out a pressure test, identify and treat identified air leakage. Enter result in EPC calculation.
EPC-E7. On 54 of 88 buildings (61%)
- 04
Consider installing PV.
EPC-R4. On 49 of 88 buildings (56%)
- 05
Introduce HF (high frequency) ballasts for fluorescent tubes: Reduced number of fittings required.
EPC-L7. On 47 of 88 buildings (53%)
How Warwick compares
Warwick has 0.3% of the industrial floorspace rated C to E in England and Wales. 67% of its buildings over 1,000 m² are below B, against 73% across the West Midlands and 70% nationally.
Against the region and the country
| Area | Over 1,000 m² | Rated C to E | C to E floor area | Rated F or G | Share below B |
|---|---|---|---|---|---|
| Warwick | 132 | 82 | 3.5m sq ft323,459 m² | 6 | 67% |
| West Midlands | 5,308 | 3,687 | 149.0m sq ft13,840,829 m² | 171 | 73% |
| England and Wales | 38,148 | 25,619 | 1.01bn sq ft94,020,657 m² | 1,037 | 70% |
Nearby in the West Midlands ranking
| Rank | Local authority | C to E floor area |
|---|---|---|
| 12 | Redditch | 4.0m sq ft372,678 m² |
| 13 | Rugby | 3.6m sq ft330,731 m² |
| 14 | Warwick | 3.5m sq ft323,459 m² |
| 15 | Shropshire | 3.3m sq ft303,963 m² |
| 16 | Lichfield | 3.1m sq ft291,426 m² |
What the 2031 proposal means
In June 2026 the government said it intends that privately rented non-domestic buildings over 1,000 m² reach EPC B from 2031, where cost effective. It needs secondary legislation, so for now it's a proposal, not law. What the proposal means
C to E: fine today, short of B
Warwick has 82 buildings over 1,000 m² rated C to E. They meet today's E minimum, but would fall short of B if the proposal becomes law while they're let.F or G: below the minimum already
6 buildings in Warwick are rated F or G. If let, they already need an improvement or a registered exemption under today's rules.Where cost effective, and only when let
The 7-year payback test and the exemptions remain. Owner-occupied buildings are counted too, as an EPC can't say whether a building is let. Local weights and measures authorities enforce the rules. MEES in plain EnglishRatings change at renewal
48 of Warwick's buildings rated C to G have an EPC that has lapsed or is estimated to lapse before 2031. Each needs a new certificate before it's let or sold, and the new rating may differ.
Go building by building
One building at a time
Search by postcode or estate name for each industrial building's rating, floor area, certificate expiry and whether it's over 1,000 m². Free, and you can save five buildings to a free account.
Check a building in WarwickThe whole local authority
Professional's area screens list every industrial building over 1,000 m² in a local authority with its rating and expiry, for 3 local authorities. £79 a month, or £790 a year.
Compare plans