MEES 2031 exposure in Warwick

82 of the 132 industrial and warehouse buildings over 1,000 m² in Warwick with an EPC are rated C to E: 3.5m sq ft (323,459 m²) of floorspace that meets today's E minimum but falls short of the proposed EPC B standard.

Free. No card needed.

Warwick in figures

EPC register, snapshot 30 Sep 2026

Rated C to E
3.5m sq ft323,459 m² in 82 buildings
Rated F or G
6 buildings458k sq ft (42,508 m²), below today's E minimum
Rated A+ to B
44 buildingsAlready at the proposed standard
Share below B
67%Of 132 buildings over 1,000 m². England and Wales: 70%

Warwick has the 94th most floorspace rated C to E of 316 local authorities in England and Wales, and the 14th most of 30 in the West Midlands.

EPC rating mix

Share of buildings over 1,000 m², by latest EPC rating

  • Warwick132 buildings
  • West Midlands5,308 buildings
  • England and Wales38,148 buildings
Key: Rated A+–B: At B or better alreadyRated C–E: Meets today's E minimum, short of BRated F–G: Below today's E minimum

Latest certificate per building from the government's EPC register, snapshot 30 Sep 2026. Industrial and warehouse uses (B2 and B8), floor area over 1,000 m² as declared on the EPC; 1 m² is 10.7639 sq ft. How we count it

What stands out in Warwick

Compared with the other 29 local authorities in the West Midlands and with England and Wales, from the same EPC register snapshot.

  • Its floorspace rated C to E is spread across sizes: 41% in buildings of 1,000 to 5,000 m², 13% in buildings of 5,000 to 10,000 m², 45% in buildings over 10,000 m².
  • Its largest buildings are likelier to meet B: 55% of the 20 over 10,000 m² are rated B or better, against 27% of those of 1,000 to 5,000 m².
  • 48 of its 88 buildings rated C to G (55%) have an EPC that has lapsed or is estimated to lapse before 2031, against 54% across England and Wales; 21 have already lapsed.
  • 13 of its 39 C-rated buildings (33%) have an asset rating of 51 to 60, within 10 points of band B: 615k sq ft (57,165 m²) of floorspace. Across England and Wales it's 37%.
  • Storage and distribution (B8) makes up 70% of its buildings over 1,000 m², against 58% across England and Wales.
  • In the 12 months to 30 Sep 2026, 19 industrial and warehouse buildings of any size here had an EPC lodged to be let and 5 for a marketed sale, 24 in all: the 7th fewest of 30 local authorities in the West Midlands.
  • The recommendation lodged most often on its certificates rated C to G is “Consider replacing T8 lamps with retrofit T5 conversion kit” (EPC-L5), on 61 of 88 buildings.

Every rating, A+ to G

Warwick's 132 industrial and warehouse buildings over 1,000 m² by latest EPC rating, beside the West Midlands and the whole of England and Wales.

By latest EPC rating

Share is of buildings over 1,000 m² in each area.

Warwick: industrial and warehouse buildings over 1,000 m² by latest EPC rating, with the share in each band and West Midlands's and England and Wales's
RatingBuildingsFloor areaShareWest MidlandsEngland and Wales
A+4418k sq ft38,841 m²3%1%2%
A243.1m sq ft288,490 m²18%9%10%
B16645k sq ft59,953 m²12%17%19%
C391.7m sq ft159,885 m²30%37%36%
D291.0m sq ft96,619 m²22%23%22%
E14721k sq ft66,955 m²11%9%9%
F4413k sq ft38,346 m²3%1%1%
G245k sq ft4,162 m²2%2%2%

Within 10 points of B

Rated C with an asset rating of 51 to 60. Band B ends at 50.

13 buildings

Of 39 rated C (33%), with 615k sq ft (57,165 m²) of floorspace. England and Wales: 37% of C-rated buildings.

By building size

Floor area as declared on the EPC.

Warwick: industrial and warehouse buildings by floor area
Floor areaBuildingsRated B or betterC to E floor area
Over 1,000 to 5,000 m²9827%26 of 981.4m sq ft133,677 m²
Over 5,000 to 10,000 m²1450%7 of 14464k sq ft43,067 m²
Over 10,000 m²2055%11 of 201.6m sq ft146,715 m²

Certificates and lettings

An EPC lasts 10 years, and a valid one is needed to let or sell. We estimate expiry as the lodgement date plus 10 years.

When the certificates lapse

Buildings over 1,000 m², by when their latest EPC lapses, at 30 Sep 2026.

Warwick: when each building's latest EPC lapses (estimated)
EPC lapsesAll buildingsRated C to GC to G floor area
Already lapsed22211.4m sq ft127,487 m²
Rest of 20261123k sq ft2,137 m²
In 2027116206k sq ft19,160 m²
In 202898419k sq ft38,953 m²
In 202997144k sq ft13,414 m²
In 2030105101k sq ft9,372 m²
2031 or later70401.7m sq ft155,444 m²

New EPCs in the last year

Industrial and warehouse buildings of any size whose latest EPC was lodged in the 12 months to 30 Sep 2026, by the reason on the certificate.

To let
19buildings
Marketed sale
5buildings
New build
1building
Other reasons
10buildings

35 in all: 54% to let, against 56% across England and Wales. How the daily feed works

Uses, heating and recommendations

What the buildings are used for, how they're heated, and what assessors recommended on the certificates of those rated C to G.

By use

Use from the EPC's property type.

Warwick: buildings over 1,000 m² by use, from the EPC's property type
UseBuildingsB or betterC to EF or GC to E floor area
Storage and distribution (B8)92355612.7m sq ft250,649 m²
General industrial (B2)409265784k sq ft72,810 m²

By main heating fuel

As recorded on each building's latest EPC.

Warwick: buildings over 1,000 m² by main heating fuel on the EPC
Main heating fuelBuildingsShareEngland and Wales
Natural gas7355%53%
Grid supplied electricity4836%37%
Oil43%4%
Other43%4%
LPG32%1%

What assessors recommend

The five most common on the latest certificates of its 88 buildings rated C to G, in the register's wording. A recommendation is the assessor's, not a requirement.

  1. 01

    Consider replacing T8 lamps with retrofit T5 conversion kit.

    EPC-L5. On 61 of 88 buildings (69%)

  2. 02

    Consider installing solar water heating.

    EPC-R3. On 57 of 88 buildings (65%)

  3. 03

    Carry out a pressure test, identify and treat identified air leakage. Enter result in EPC calculation.

    EPC-E7. On 54 of 88 buildings (61%)

  4. 04

    Consider installing PV.

    EPC-R4. On 49 of 88 buildings (56%)

  5. 05

    Introduce HF (high frequency) ballasts for fluorescent tubes: Reduced number of fittings required.

    EPC-L7. On 47 of 88 buildings (53%)

How Warwick compares

Warwick has 0.3% of the industrial floorspace rated C to E in England and Wales. 67% of its buildings over 1,000 m² are below B, against 73% across the West Midlands and 70% nationally.

Against the region and the country

Warwick against the West Midlands and England and Wales: industrial and warehouse buildings over 1,000 m²
AreaOver 1,000 m²Rated C to EC to E floor areaRated F or GShare below B
Warwick132823.5m sq ft323,459 m²667%
West Midlands5,3083,687149.0m sq ft13,840,829 m²17173%
England and Wales38,14825,6191.01bn sq ft94,020,657 m²1,03770%

Nearby in the West Midlands ranking

Local authorities ranked next to Warwick in the West Midlands by floorspace rated C to E
RankLocal authorityC to E floor area
12Redditch4.0m sq ft372,678 m²
13Rugby3.6m sq ft330,731 m²
14Warwick3.5m sq ft323,459 m²
15Shropshire3.3m sq ft303,963 m²
16Lichfield3.1m sq ft291,426 m²

What the 2031 proposal means

In June 2026 the government said it intends that privately rented non-domestic buildings over 1,000 m² reach EPC B from 2031, where cost effective. It needs secondary legislation, so for now it's a proposal, not law. What the proposal means

  • C to E: fine today, short of B

    Warwick has 82 buildings over 1,000 m² rated C to E. They meet today's E minimum, but would fall short of B if the proposal becomes law while they're let.
  • F or G: below the minimum already

    6 buildings in Warwick are rated F or G. If let, they already need an improvement or a registered exemption under today's rules.
  • Where cost effective, and only when let

    The 7-year payback test and the exemptions remain. Owner-occupied buildings are counted too, as an EPC can't say whether a building is let. Local weights and measures authorities enforce the rules. MEES in plain English
  • Ratings change at renewal

    48 of Warwick's buildings rated C to G have an EPC that has lapsed or is estimated to lapse before 2031. Each needs a new certificate before it's let or sold, and the new rating may differ.

Go building by building

  • One building at a time

    Search by postcode or estate name for each industrial building's rating, floor area, certificate expiry and whether it's over 1,000 m². Free, and you can save five buildings to a free account.

    Check a building in Warwick
  • The whole local authority

    Professional's area screens list every industrial building over 1,000 m² in a local authority with its rating and expiry, for 3 local authorities. £79 a month, or £790 a year.

    Compare plans

The Industrial EPC Weekly

Last week's new industrial EPCs by region, every Monday. Free.